Tape Street Car park Repairs

Complete

Value

£0

Classifications

  • Macadam, tarmac and tar sands

Tags

  • tender

Submission Deadline

3 years ago

Published

3 years ago

Description

Staffordshire Moorlands District Council wish to appoint a suitably experienced and competent contractor through a competitive tender exercise to complete repairs work at Tape Street Car Park.

This exercise is being managed through the Council's Electronic tendering system Proactis. To Register an Interest and submit a tender for this opportunity please click on the link below, 

Project reference number DN535281

https://supplystokeandstaffs.proactishosting.com/

You will need to register or log in (if you have already registered). If you have any queries or need assistance please contact us.

Reference: P4577

Closing date and time: Monday 3rd May 2021 12:00 (Noon)

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Works to The Tye Footpath

Demolition Specification Excavate existing footpath & ground to a depth of 160mm; remove all redundant material from site and dispose. Contractor to agree site measurement with Council representative and document prior to submission. The Works Phase 1 Carry out demolition as specified. Lay new footpath; 1.2 meter wide between edgings x 111 meter long to North end of the Tye. Composite edging bedded on and haunched back & front with concrete. Every care must be taken in relation to levels; the contractor must account for water escape from the finished surface and any adjoining hard surfaces. Phase 2 Carry out demolition as specified. Lay new footpath; 1.2 meter wide between edgings x 119 meter long to South end of the Tye. Composite edging bedded on and haunched back & front with concrete. Every care must be taken in relation to levels; the contractor must account for water escape from the finished surface and any adjoining hard surfaces. Specification/Notes Include all site safety barriers for public, maintain public access throughout works. Ensure public Health & Safety during works. Install weed preventative and weight stabilising membrane to all new works; lay 100mm certified MOT type 1 crushed limestone or equivalent, machine roll. Adjust all manhole chambers, water/gas stop tap boxes etc in height to new finished surfaced pathway Lay to total area 40mm 0f 20mm binder course tarmacadam and 20mm 0f 6mm surface course tarmacadam and machine roll. Tar any joints with hot poured bitumen to seal where new surface meets surrounding surface. Clear away and make good on completion Note: Please provide a price for each Phase as a separate works package including all associated set up costs. In the event that both Phase 1 & 2 are carried out concurrently please provide your discount for the combined works on the collection sheet

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete