Description

EKFB seek EOI's from interested parties for the Hire of Siltbusters (Option for disposal of waste arising) & Water Pumps in the form of a call-off framework agreement to support the delivery of our C23 HS2 project. The 5 areas for delivery are North Chilterns Area (NCA), Aylesbury Area (AA), Calvert Area (CA), Twyford to Greatworth (T2G) and Greatworth to Southam (G2S).
      
      EKFB is proud to have been appointed by HS2 to deliver civil engineering works across an 80km section of the new high speed rail link between the Chiltern Tunnel and Long Itchington Wood. Our scope of the works includes 15 viaducts, 6.9km of green tunnels, 22km of road diversions, 81 bridges and around 30 million cubic metres of excavation. 
      
      EKFB may look to award multiple frameworks to suit geographical capability dependant on the response to this EOI, in support of SME's and Local Businesses.   
       Through this expression of interest you vetted in accordance with the Eiffage Kier Ferrovial BAM prequalification model (Common Assessment Standard) - for further information visit https://www.competefor.com/EiffageKier/
      
      Upon successful shortlisting you will be invited to tender from the EKFB's eSourcing platform Market Dojo
      
      EKFB will be using a balanced scorecard approach to its procurement activities - for further information visit the above website  
       EKFB is a joint venture that brings together international, market leading expertise from four leading civil engineering and construction companies: Eiffage, Kier, Ferrovial Construction and BAM Nuttall. All four partners bring specialist expertise in the design, construction, operation, financing and maintenance of railway networks, including some of Europe's largest high speed rail projects.
      
      EKFB is committed to improving lives, communities and the engineering and construction industry by providing sustained employment opportunities and being a good neighbour, protecting the environment and the places we work. Our inclusive culture ensures that our collaborative and innovative solutions provide exceptional value for money.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Chesterfield Canal Trust - Main Works Contractor

This Main Works package will restore around 350m of canal and associated works. In summary this will include the construction of canal channel, a lock, vehicle access bridge, the creation of Public Rights of Way (PROW) and the installation of a water supply pumping system. An overview of the works is listed below: Groundworks • Strip existing topsoil and stockpile • Installation of necessary temporary access roads and hardstanding areas to facilitate the proposed construction methodology • Implement agreed temporary protection measures to utilities • Excavation to formation levels • Testing of excavated materials as required by the remediation strategy • Stockpiling on site of suitable excavated material • Disposal off site of any materials deemed unsuitable • Installation of drainage • Placing excavated and imported materials to final profiles, including topsoil • Any other temporary works required to facilitate the proposed construction methodology, including the design of all such temporary works Canal • Construction of 350m of canal channel, including soft and hard edging • Install pumping system for water supply • Canal overflow Bellhouse Lane Bridge • Construction of new vehicular access bridge • Excavation to formation and construction of bridge foundations • Fabrication, delivery, assembly and installation of precast culvert • Formation of earth approach ramps • Road surfacing, vehicle restraint system and drainage to bridge • Surfacing and drainage to footpath approaches Lock • Construct new lock structure, including in-situ concrete, coping stones and brick facing • Manage installation of lock gates (via nominated supplier) Rights of Way • Constructing and / or maintaining temporary rights of way, including farm access • Construction, realignment or upgrade of 2.2km of footpaths • Removal of temporary footpaths and associated reinstatement • Installation only of new fingerboard signage for pedestrian routes Soft and Hard Landscaping Clay Relocation • Movement and placement of clay • Reworking of clay as per Earth Works Spec Report for clay liner CDM • Fulfilment of the Principal Contractor role as defined under CDM Regulations 2015 The tender documents are available from Jon Lindley. His contact details are: Email: [email protected] Mobile: 07891624755 The procurement process is set out in the ITT, but will broadly consist of a single stage submission followed by an interview. Site Visit It is highly recommended that you conduct a site visit whilst preparing your submission. The Client will be hosting a site visit on 3 or 4 December 2024. This is an opportunity for all Contractors who have confirmed their intention to bid to attend the site with the Client. Upon receipt of the ITT please advise if you wish to attend the Client hosted site visit. Additional information: The tender documents are available from Jon Lindley. His contact details are: Email: [email protected] Mobile: 07891624755 The procurement process is set out in the ITT, but will broadly consist of a single stage submission followed by an interview. Site Visit It is highly recommended that you conduct a site visit whilst preparing your submission. The Client will be hosting a site visit on 3 or 4 December 2024. This is an opportunity for all Contractors who have confirmed their intention to bid to attend the site with the Client. Upon receipt of the ITT please advise if you wish to attend the Client hosted site visit.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete