PROJECT CHARM : Virtually Plastic Free Homes Roofing Works (SC5) - AWARD

Award

Value

£30,000

Classifications

  • Roof works and other special trade construction works

Tags

  • award

Submission Deadline

3 years ago

Published

3 years ago

Description

Project: CHARM virtually plastic free homes
      Contractor Discipline: SC5 Roofing Works
      
      The work completed through these tenders will inform the design and manufacturing work within the CHARM project, a project which is supported by the EU Interreg North-West Europe and Accord Housing Association.
      CHARM stands for Circular Housing Asset Renovation & Management and it aims to reduce the amount of waste in the housing construction sector. The building sector is responsible for more than 60% of resource use in Europe, with more than 30-50% of material use taking place in the housing construction sector.
      The CHARM project is a new development of 12 one bedroom homes between Edward Street, Redditch and railway line. The design of these aims to create plastic free homes, which will apply timber frame construction, allowing for easy assembly, disassembly and re-assembly and re-use of components and thus relocation in case housing demands drops, whilst avoiding the use of heavy weight concrete and traditional construction methods that do not lend itself easily for prevention of down-cycling. Accord Housing Association will minimize the use of plastic during the construction process.
      
      We will not allow any unauthorised plastics to enter the CHARM site.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Decarbonisation – Boiler Replacement

The objective of the PME is to gain market insight for the procurement of a Principal Contractor to deliver the Boiler replacement – Decarbonisation upgrade project. There is a single Contracting Authority for the scheme in Royal Armouries. There are no external organisations involved within the procurement of this scheme. Information in relation to the Boilers is available within Appendix A. ROYAL ARMOURIES are looking to gather feedback on which technologies are available to develop the project to take from the start of RIBA 2 through to RIBA 7. Outcomes: Royal Armouries wish to embark on a decarbonisation project to replace the existing 3 Boilers, with a new more energy efficient technology. The project forms the first step in the development of the Royal Armouries sites to meet their Net Zero targets. The Hot Water Heating Boilers are currently aged, manufactured in 1995, installed at Royal Armouries, Leeds during the initial build of the site, the Boilers use natural gas to provide heating and hot water. This project will form part of a larger decarbonisation plan for the Royal Armouries estate, the improvements to infrastructure, reliability and energy savings will provide much needed improvements to the Museum. The energy savings both in cost and CO2 generation, will allow for further developments to continue to improve the Museum. This will ensure that the Museum continues to provide its historical and cultural impact whilst maintaining a site that Visitors will want to utilise for not only the educational history that the Museum provides but also allow for increasing specialist events and exhibitions such as Gladiators: Heroes of the Colosseum. This Project shall provide the first major project in the Royal Armouries decarbonisation strategy. The successful delivery of which shall provide a key case study for future Business cases and proposals to allow for further decarbonisation projects. The Project estimated Contract dates are the 01/10/2025 – 31/03/2026 following completion of the Tender period. The Contract expiry date shall not be extended. The opportunity is suitable for SME’s and VSCE’s to participate in Tendering and PME. Site visits, should they be required will be arranged following issue of the PME with resulting requests for attendance to the Royal Armouries. To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=968321867

Katy Reed

Published 4 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Simon Wilmott

[email protected]

01249 465465

Timeline complete

Publish
Bid
Evaluate
Award
Complete