KU314. David Weatherall Building Chilled Water Upgrades. - AWARD

Award

Value

£340,000

Classifications

  • Engineering works and construction works

Tags

  • award

Submission Deadline

3 years ago

Published

3 years ago

Description

Tenders are invited from interested parties for the David Weatherall Building Chilled Water upgrade works at Keele University.  The Contract covers all of the works and services required as detailed in the Tender Specification in Section 2 of the ITT.
      The contract covers two options, these being:
      Option 1: Main Works - Replacement of roof top chillers and chilled water distribution upgrades.
      Option 2: Chiller Replacement only - Replacement of roof top chillers and connection to existing chilled water distribution system.
      
      The Contract will run for a period of 10 weeks, from: 20th December 2021 to 4th March 2022. 
      The requirements specification and the drawings for each option are detailed in the Tender Specification in Section 2 of the ITT.
      It is a mandatory requirement that Tenderers must submit a tender and bid for both options.
      The University is seeking to appoint a single provider to deliver all of the works and services required under the contract
       
      The estimated total value of the Contract for the David Weatherall Building Chilled Water upgrade works at Keele University is:
      £340,000.00 excluding VAT for Option 1.
      £220,000.00 excluding VAT for Option 2.
      
      The University shall identify the most economically advantageous tender in accordance with the criteria set out  in the Invitation to tender documents (Itt).  
      The maximum score available is 1000 marks, divided into 600 marks for Technical (Quality) and 400 marks for Commercial (Price).

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Flood Cell 06, Snape Maltings

The Upper Alde & Ore Estuary Embankment Improvements scheme will reduce tidal flood riskand enhance the environment in the Upper Alde and Ore Estuary. The Alde and Ore Estuary is vulnerable to flooding from the sea made worse by the poor condition of many of the flood defences. The proposed Flood Cell 06, Snape Maltings scheme is 1 of 4 cells identified to improve the Standard of Service of the existing flood defences and provide resilience to withstand 300mm of overtopping from a 1:200+ year event, given predicted sea levels in 2050. The Client is theEast Suffolk Water Management Board. In summary, the scope of Works for the project includes civil engineering works (but is not limited to):  Establish main site offices, compound, temporary services and access routes.  Alliance House - Installation of approximately 20m of new demountable defences along the quay side with piled and concrete slab foundation;  River Alde Quay - Installation of approximately 120m of new demountable defences along the northern quay side with piled and concrete slab foundation;  Henry Moore Lawn - Improvement to approximately 80metres of earth flood embankment to be constructed in a passive fashion to provide improved flood protection and amenity and access value around the Henry Moore Lawn area terminating at the northeastern edge of the Concert Hall building; and  Terrace Car Park - Improvement to approximately 100metres of earth flood embankment, incorporating pedestrian access provision, constructed from the River Cafe terrace area, terminating into the southeast car park area. The works are estimated to cost around £2.3million. The form of contract will be a NEC4 ECC Option A. All tender documents are available through the Client or the Client's appointed tender and contract manager Stantec UK Ltd.

Katy Reed

Published 3 days ago
Open

Flood Cell 06, Snape Maltings

The Upper Alde & Ore Estuary Embankment Improvements scheme will reduce tidal flood riskand enhance the environment in the Upper Alde and Ore Estuary. The Alde and Ore Estuary is vulnerable to flooding from the sea made worse by the poor condition of many of the flood defences. The proposed Flood Cell 06, Snape Maltings scheme is 1 of 4 cells identified to improve the Standard of Service of the existing flood defences and provide resilience to withstand 300mm of overtopping from a 1:200+ year event, given predicted sea levels in 2050. The Client is theEast Suffolk Water Management Board. In summary, the scope of Works for the project includes civil engineering works (but is not limited to):  Establish main site offices, compound, temporary services and access routes.  Alliance House - Installation of approximately 20m of new demountable defences along the quay side with piled and concrete slab foundation;  River Alde Quay - Installation of approximately 120m of new demountable defences along the northern quay side with piled and concrete slab foundation;  Henry Moore Lawn - Improvement to approximately 80metres of earth flood embankment to be constructed in a passive fashion to provide improved flood protection and amenity and access value around the Henry Moore Lawn area terminating at the northeastern edge of the Concert Hall building; and  Terrace Car Park - Improvement to approximately 100metres of earth flood embankment, incorporating pedestrian access provision, constructed from the River Cafe terrace area, terminating into the southeast car park area. The works are estimated to cost around £2.3million. The form of contract will be a NEC4 ECC Option A. All tender documents are available through the Client or the Client's appointed tender and contract manager Stantec UK Ltd.

Katy Reed

Published 1 week ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Theresa Bill

[email protected]

01782 734124

Timeline complete

Publish
Bid
Evaluate
Award
Complete