Lee Valley Regional Park Authority Leisure Services Contract - AWARD

Award

Value

£0

Classifications

  • Recreational, cultural and sporting services

Tags

  • award

Submission Deadline

6 years ago

Published

3 years ago

Description

The Authority is seeking an ambitious and experienced operator for six major sporting Facilities which are key to maintaining and developing the park's vision and status as a world class leisure destination. The Authority is a community focused, commercially driven organisation which, over the last 50 years, has led the transformation of the Lee Valley in London, Essex and Hertfordshire. The Authority is  driven by the desire to create a high quality, sustainable, unique visitor destination which is accessible to everyone and helps people improve their mental and physical well-being. 
      
      This is a unique opportunity for an operating partner to benefit from the prestige and kudos of running complex, internationally recognised Facilities which have potential for further commercial growth. The Authority intends to procure a new 10 year operator contract, extendable by five years, (the Contract) through competitive procurement (with negotiation). The Authority wants to engage with operators who share our philosophy ahead of finalising the specification and other contractual documentation, procurement process and timetable. This is so that it can take account of industry views to ensure that the final specification is challenging but achievable and maximises the opportunities for both the Authority and the successful operator.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Callington Skate Park

Construction Plan 1. Scope of Works. The works will include: • Site preparation and demolition of existing fence. • Earthworks, grading and sub-base preparation. • Installation of drainage systems. • Construction of reinforced concrete skatepark elements (bowls, ramps, platforms, coping). • Installation of street-style features (rails, ledges, stairs). • Perimeter works including pathways and landscaping. • Site clean-up, quality checks, and handover. 2. Methodology 2.1 Mobilisation • Establish site compound, temporary fencing and signage. • Set out works in accordance with approved design drawings. • Conduct pre-start meetings with subcontractors and suppliers. 2.2 Site Preparation • Clear vegetation, debris and unsuitable materials. • Carry out excavation to design levels. • Import and compact subgrade fill where required. 2.3 Drainage & Utilities • Install sub-surface drainage to prevent water pooling. • Connect to existing stormwater infrastructure. • Install conduits for future lighting and services. 2.4 Concrete Works • Coping and edging hot dipped galvanised. Cut ends to be treated with corrosion resistant paint system • Formwork, steel reinforcement and shotcrete application for bowls and ramps. • Machine finishing followed by hand-trowelling for smooth riding surfaces. • Expansion joints, coping stones and steel edges installed. 2.5 Ancillary Works • Install prefabricated hot dipped galvanised rails, ledges and modular features. • Construct pathways, seating areas and viewing zones. • Landscape the surrounding area. 3. Health, Safety & Environmental Management • Works to be carried out in accordance with [local construction safety legislation]. • Dust suppression and noise control measures. • Daily toolbox talks and risk assessments. • Waste management and recycling plan. • Public safety maintained through secure site fencing and restricted access. • Working hours 0800 to 1700. • All operatives working on site should have relevant CSCS cards.

Katy Reed

Published 3 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete