The Ruskin Building Refurbishment Project - AWARD

Complete

Value

£0

Classifications

  • Refurbishment work

Tags

  • awardUpdate

Submission Deadline

3 years ago

Published

3 years ago

Description

Lancaster University is inviting Expressions of Interest (EOI) and selection stage submissions from contractors interested in tendering for The Ruskin Building Refurbishment Project.
      
      The Ruskin now requires a programme of works to refurbish and alter the building layout, including the replacement of plant and machinery that is reaching the end of its service life.   
      The refurbishment of The Ruskin Building must meet statutory requirements and the standards and guidelines defined by the National Heritage Memorial Fund and other funding bodies, to ensure the safety of The Ruskin Whitehouse Collection and to achieve University Museum Accreditation. 
      
      A site visit will take place at 2pm on 18th January 2022. Please contact Jessica Mottershaw through In-Tend to register your attendance.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Penrith Police Station Refurbishment 2025

The Penrith Police Station is an existing 3 storey building (located in the centre of Penrith) and will remain occupied in 24 hours operation for the duration of the works. The work will be carried out in phases including stand-down time between the phases to allow for decanting and re-occupation of completed areas. Externally: Formation of the Contractor's compound. For further details refer to the Access and Site Limitations drawing K1026-0-05 and Section 4.2 Significant Risks identified during Design. Any site accommodation located adjacent to surrounding buildings is to be 60 min fire resistant. Internally: The work content involves the refurbishment of individual rooms located on each floor level of the 3-storey building. Refer to Phasing Drawing K1026-0-04A. The refurbishment will involve stripping out all redundant fixtures, fittings and worktops, stripping out wallpaper and preparing finishes, replacement flooring, redecoration, replacement ceilings and LED lighting. The works (particularly to the services and drainage) may require penetration through existing fire-resistant construction and/or cavity barriers. The Contractor is required to have verifiable procedures in place for the making good, introduction of proprietary fire collars/sleeves etc. to maintain the integrity of the fire-resistant construction and/or cavity barriers. In addition to the installation of these services and drainage, a verifiable inspection and certification procedure for the integrity of the fire-resistant construction is required for submission at the completion of the Works.

Katy Reed

Published 23 hours ago
Open

Penrith Police Station Refurbishment 2025

The Penrith Police Station is an existing 3 storey building (located in the centre of Penrith) and will remain occupied in 24 hours operation for the duration of the works. The work will be carried out in phases including stand-down time between the phases to allow for decanting and re-occupation of completed areas. Externally: Formation of the Contractor’s compound. For further details refer to the Access and Site Limitations drawing K1026-0-05 and Section 4.2 Significant Risks identified during Design. Any site accommodation located adjacent to surrounding buildings is to be 60 min fire resistant. Internally: The work content involves the refurbishment of individual rooms located on each floor level of the 3-storey building. Refer to Phasing Drawing K1026-0-04A. The refurbishment will involve stripping out all redundant fixtures, fittings and worktops, stripping out wallpaper and preparing finishes, replacement flooring, redecoration, replacement ceilings and LED lighting. The works (particularly to the services and drainage) may require penetration through existing fire-resistant construction and/or cavity barriers. The Contractor is required to have verifiable procedures in place for the making good, introduction of proprietary fire collars/sleeves etc. to maintain the integrity of the fire-resistant construction and/or cavity barriers. In addition to the installation of these services and drainage, a verifiable inspection and certification procedure for the integrity of the fire-resistant construction is required for submission at the completion of the Works.

Katy Reed

Published 23 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Jessica Mottershaw

[email protected]

1524595027

Timeline complete