Soft Play

Award

Value

£49,862

Suppliers

Classifications

  • Recreational, cultural and sporting services

Tags

  • award

Submission Deadline

4 years ago

Published

3 years ago

Description

To manufacture, supply & install new soft play unit. 

Ground floor:
• The entranceway will lead to a corridor which will be populated by biff bash snakes.
• You can continue to the infinity mirror through some butchers curtains or turn right which will lead to the soft play area (full of exciting soft play objects)
• You can then take the tumble tower up to the 1st floor.
• Or for the short cut to the bumpy slide take the log ramp up to the 1st floor

First floor 
• Once you reach the first floor, you can go 4 separate directions, 
• The main attraction being the rope bridge, which is a crazy 3.6 meters long and raised up by 2 meters. This travels directly over the café area.
• Before you get to it you need to traverse the cargo net and the large biff bash bags.
• Look down. When you get to either corner before the rope bridge you will find clear acrylic floors that you can see straight through.
• Traverse the rope bridge and you will come across the stepping-stone cargo net. 
• After another set of biff bash bags, you can tackle the rope spiders web. 
• The slide is over in the far corner and can be easily accessed by the handy log ramp placed right beside it. 
• Take a trip up another level to get to the treetop canopy 

Second floor 
• This will involve a lot of crawling; there will be a hump on the middle floor panel with some small biff bash bags. 
• On either side of the of this treetop canopy will be wavy mirrors. 
• Climb back down the tumble tower and then take a trip down the waterfall slip-slide tower back to ground level.
Climb back up the log ramp and do it all again.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Yate Town Council Peg Hill Skatepark Refurbishment Project

Yate Town Council is seeking to appoint a contractor to design and build the refurbishment of the existing Peg Hill Skatepark. The anticipated budget for this project is £450,000 excluding VAT; this value is inclusive of a 10% contingency budget (£45,000). Full procurement description is included within the Peg Hill design brief, however, please find below the project priorities and design specification: The Peg Hill Skate Park refurbishment seeks to achieve the following priorities: a. Provide a 25year life cycle (minimum); b. Use of sustainable, hardwearing materials with long life cycles that are resistant to climate change (extreme wet/ heat) and anti-social behaviour; c. Improved health and safety, areas for weather shade, materials that are low heat conducting d. Low impact on the climate and planet, refurbishing/ reusing/ recycling as much as possible; using materials and practices that are sustainable e.g. low carbon footprint, chemical free, supportive of the local economy and local workforce; e. Value for public investment, a design with low maintenance and risk of repair; f. Expansion of inclusive features e.g. disability, neurodiversity, making space for girls; g. A design suitable for varying abilities and disciplines - beginner to advanced level users, for large and small wheels; h. Refurbishment works must commence on site in Spring 2026 and conclude by 30th September 2026. Tenderers are asked to submit proposals for a refurbishment design of Peg Hill Skate Park that: a. Respond to the priorities outlined in the public survey (Appendix 2, question 7.a within design brief and Project Priorities above. b. Takes place within the current footprint of the skatepark, making best use of the space available, and popular features that could be refurbished/ retained (designs should not include any equipment that requires planning permission, or that exceeds planning and/or safety restrictions, such as permitted development. If post contract signing, design revisions are required to meet planning and/or safety requirements, costs incurred will be the responsibility of the supplier, not Yate Town Council (as per the JCT Design & Build contract clause 2.17.1) c. Retains a below ground bowl feature, identified in a public survey as a high priority; d. Incorporates the most popular design features, identified in the phase 2 public survey (questions 6 and 7, appendix 2 within design brief). Suppliers may also wish to take inspiration from the skate parks identified in question 7, appendix 2 within design brief) e. Emphasises creativity and the importance of allowing for varying levels of interaction with the skateable features, to support varying levels of confidence and ability. The site location and area for works is outlined within the design brief document.

Katy Reed

Published 2 days ago
Open

Outdoor gym equipement

Invitation to Quote: Supply and Installation of Outdoor Fitness Equipment and Associated Works Overview The contracting authority is seeking quotations for the supply, delivery, installation, surfacing, and post-installation inspection of outdoor fitness equipment and associated infrastructure. Scope of Works The project includes (but is not limited to): Fitness Equipment Supply & Installation • Magnetic Bells Pro (1 unit) • Surface Challenge 3 (1 unit) • Balance Board (1 unit) • Double Stairs (1 unit) • Flex Wheel (1 unit) • Bike (1 unit) • Associated safety signage Surfacing & Groundworks • Site excavation and disposal • Supply and installation of MOT Type 1 stone base with geotextile membrane • Supply and installation of bonded rubber mulch safety surfacing (40mm depth, including trench edging) Preliminaries & Site Setup • Temporary fencing supply, erection, hire, and dismantling • Skip hire for mixed waste • Storage container hire • Welfare facilities (Hotwash unit) • Telehandler hire Inspection • Independent RPII post-installation safety inspection by a qualified inspector Deliverables • Fully installed outdoor fitness equipment • Safety-compliant surfacing and groundwork preparation • Independent inspection report Submission Requirements Interested suppliers must provide: • A detailed quotation including unit rates and total costs • Proposed timeline for delivery and installation • Evidence of relevant experience in similar projects • Proof of insurance and health & safety compliance Evaluation Criteria Submissions will be evaluated on the basis of: • Cost • Technical compliance with requirements • Delivery and installation timescales • Track record and references Deadline for Submissions Quotations must be submitted by 23rd September 2025 to [email protected].

Katy Reed

Published 6 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete