Hexagon Housing Association Repairs and Voids Contract

Award

Value

£34,454,719

Classifications

  • Construction work

Tags

  • award

Submission Deadline

4 years ago

Published

3 years ago

Description

Hexagon Housing Association ("Hexagon") has sought expressions of interest from suitably skilled and experienced suppliers for the delivery of responsive repairs and void property works, including emergencies out of office hours and a fully comprehensive customer service centre solution. The contract will also include ad hoc planned works such as kitchen and bathroom replacements and electrical rewiring and installation works. The contract has been awarded to a single Service Provider under a TPC 2005 (as amended) for 10 years, with break clauses included for non-performance and the like.

To procure the new contract, Hexagon followed a three-stage Competitive Dialogue procedure under the Public Contracts Regulations 2015. Under the first stage of the process, prospective bidders were required to complete a Selection Questionnaire and its associated appendices. Following evaluation of submitted SQs, Hexagon shortlisted three bidders to be Invited to Submit Dialogue Solutions under the second stage of the process. Following evaluation of received ISDS submissions, Hexagon shortlisted 3 Tenderers to be invited to participate in Competitive Dialogue.

Full details of all the requirements and how to participate were included in the procurement, SQ documents.

Similar Contracts

Open

HVAC at Energy House 1

1.1.1 The University of Salford (UoS) is a leading public institution located in Greater Manchester, UK, with a strong reputation for combining academic excellence and industry engagement. Established in 1967, it serves over 20,000 students across undergraduate, postgraduate, and research programs. Salford is recognised for its close ties to industry, particularly in media, health, engineering, and digital sectors, supported by its strategic location adjacent to MediaCityUK. 1.1.2 The University operates two unique research facilities: Energy House 1 and Energy House 2.0. Both facilities contain environmental climate chambers that house test buildings. Energy House 1, located in the Cockcroft building, features a Victorian End Terrace House and was the first of its kind when constructed. The chamber enables the simulation of a wide range of European weather conditions, allowing for the testing of construction products and heating systems under controlled conditions environments. The environmental chamber has a dedicated heating and ventilation and air conditioning (HVAC) system. 1.1.3 After more than 10 year in operation, Energy House 1 is experiencing maintenance and performance issues with its existing HVAC system. Over time, both testing methods and the technologies under evaluation have evolved. For example, the introduction of Air Source Heat Pumps (ASHPs) has created new requirements for humidity control. The majority of work performed at Energy House 1 involves replicating outside temperature experienced during the UK heating season (-5 °C to +15 °C). Clients also express interest in performing research in extreme winter and summer conditions (-10 °C to +40 °C).

Katy Reed

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete