Havant Thicket Reservoir Project - Main Works Pipeline

Complete

Value

£41,014,620

Classifications

  • Construction work for water projects

Tags

  • awardUpdate

Submission Deadline

2 years ago

Published

2 years ago

Description

This represents a flagship project to construct the first new strategic water resource, and corresponding pipeline, in the South East for decades. Construction work is anticipated to start on the Havant Thicket Reservoir Project (the "Project") in 2024, for completion by 2029. The Project is the product of collaborative regional water planning particularly between Portsmouth Water and Southern Water, and forms a key step in increasing water resilience in the South East. The procurement of the main works contractor for pipeline construction works was carried out together with the procurement of the framework agreement for wider design services, together advertised in FTS Contract Notice 2021/S 000-000072. However, this award notice relates only to the award of the main pipeline works contract. It is anticipated that the framework agreement will be the subject of a separate award notice once the framework agreement has been completed.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Term Contract for Maintenance Dredging of the River Parrett: winter 2025/26 to 2029/30

The Parrett Internal Drainage Board (PIDB) (a member of the Somerset Drainage Boards Consortium (SDBC)) is acting on behalf of Somerset Rivers Authority (SRA) to commission a five-year term contract for annual dredging works on tidal reaches of part of the Rivers Parrett and Tone in Somerset to retain the conveyance capability achieved as a result of pioneer dredging by the Environment Agency following extensive flooding in the catchment during winter 2013/14. An annual work schedule will be prepared for each year that funding is available on nominated reaches of the river(s) to be dredged. The 2025/26 schedule comprises a reach of approximately 4.8km of the River Parrett, downriver of Burrowbridge, Somerset, UK, as detailed in the example contract drawings included for tender quotation only (actual quantities will be assessed later this year for delivery winter 2025/26. Recent trend data indicates that this will involve dispersal of approximately 25,000m3 of silt. Works are to be conducted in accordance with a Public Sector Cooperation Agreement between SDBC and EA and the 'River Parrett Water Injection Maintenance Dredging - Environmentally Acceptable Protocol' that currently restricts working in the rivers to the period 01 December to 28 February, and to the use of water injection dredging methods within the main channel following a course along the river thalweg such that mobilised sediment deposits are dispersed on ebb tides i.e. not removed to land from the river and targeted mechanical removal of excess material from the upper banks using an excavator (our preferred method is for this to be a water mounted operation working in tandem with the WID). I am pleased to issue tender documents for the contract for your consideration. The conditions of contract will be the NEC Engineering and Construction Short Contract, Third Edition with additional Z clauses. Kindly notify your intention to tender in advance of any submission and within 1 week of this notice being published. Your completed tender submission (completed Contractor's Offer, priced activity schedule, method statement, equipment specification and proposed contract starting and completion dates) should be returned by noon on the date specified in the tender documentation. Tenders will be assessed on the basis of price (60%) and quality (40%) in line with the attached Tender Quality Assessment (TQA). The TQA requires an overall method statement and a detailed description of the proposed process and equipment specification, including anticipated productivity in m3/day/hr. These will be scored against the criteria indicated in the TQA.

Katy Reed

Published 1 week ago
Open

Term Contract for Maintenance Dredging of the River Parrett: winter 2025/26 to 2029/30

The Parrett Internal Drainage Board (PIDB) (a member of the Somerset Drainage Boards Consortium (SDBC)) is acting on behalf of Somerset Rivers Authority (SRA) to commission a five-year term contract for annual dredging works on tidal reaches of part of the Rivers Parrett and Tone in Somerset to retain the conveyance capability achieved as a result of pioneer dredging by the Environment Agency following extensive flooding in the catchment during winter 2013/14. An annual work schedule will be prepared for each year that funding is available on nominated reaches of the river(s) to be dredged. The 2025/26 schedule comprises a reach of approximately 4.8km of the River Parrett, downriver of Burrowbridge, Somerset, UK, as detailed in the example contract drawings included for tender quotation only (actual quantities will be assessed later this year for delivery winter 2025/26. Recent trend data indicates that this will involve dispersal of approximately 25,000m3 of silt. Works are to be conducted in accordance with a Public Sector Cooperation Agreement between SDBC and EA and the 'River Parrett Water Injection Maintenance Dredging - Environmentally Acceptable Protocol' that currently restricts working in the rivers to the period 01 December to 28 February, and to the use of water injection dredging methods within the main channel following a course along the river thalweg such that mobilised sediment deposits are dispersed on ebb tides i.e. not removed to land from the river and targeted mechanical removal of excess material from the upper banks using an excavator (our preferred method is for this to be a water mounted operation working in tandem with the WID). I am pleased to issue tender documents for the contract for your consideration. The conditions of contract will be the NEC Engineering and Construction Short Contract, Third Edition with additional Z clauses. Kindly notify your intention to tender in advance of any submission and within 1 week of this notice being published. Your completed tender submission (completed Contractor's Offer, priced activity schedule, method statement, equipment specification and proposed contract starting and completion dates) should be returned by noon on the date specified in the tender documentation. Tenders will be assessed on the basis of price (60%) and quality (40%) in line with the attached Tender Quality Assessment (TQA). The TQA requires an overall method statement and a detailed description of the proposed process and equipment specification, including anticipated productivity in m3/day/hr. These will be scored against the criteria indicated in the TQA.

Katy Reed

Published 1 week ago
Open

Term Contract for Maintenance Dredging of the River Parrett: winter 2025/26 to 2029/30

The Parrett Internal Drainage Board (PIDB) (a member of the Somerset Drainage Boards Consortium (SDBC)) is acting on behalf of Somerset Rivers Authority (SRA) to commission a five-year term contract for annual dredging works on tidal reaches of part of the Rivers Parrett and Tone in Somerset to retain the conveyance capability achieved as a result of pioneer dredging by the Environment Agency following extensive flooding in the catchment during winter 2013/14. An annual work schedule will be prepared for each year that funding is available on nominated reaches of the river(s) to be dredged. The 2025/26 schedule comprises a reach of approximately 4.8km of the River Parrett, downriver of Burrowbridge, Somerset, UK, as detailed in the example contract drawings included for tender quotation only (actual quantities will be assessed later this year for delivery winter 2025/26. Recent trend data indicates that this will involve dispersal of approximately 25,000m3 of silt. Works are to be conducted in accordance with a Public Sector Cooperation Agreement between SDBC and EA and the 'River Parrett Water Injection Maintenance Dredging - Environmentally Acceptable Protocol' that currently restricts working in the rivers to the period 01 December to 28 February, and to the use of water injection dredging methods within the main channel following a course along the river thalweg such that mobilised sediment deposits are dispersed on ebb tides i.e. not removed to land from the river and targeted mechanical removal of excess material from the upper banks using an excavator (our preferred method is for this to be a water mounted operation working in tandem with the WID). I am pleased to issue tender documents for the contract for your consideration. The conditions of contract will be the NEC Engineering and Construction Short Contract, Third Edition with additional Z clauses. Kindly notify your intention to tender in advance of any submission and within 1 week of this notice being published. Your completed tender submission (completed Contractor's Offer, priced activity schedule, method statement, equipment specification and proposed contract starting and completion dates) should be returned by noon on the date specified in the tender documentation. Tenders will be assessed on the basis of price (60%) and quality (40%) in line with the attached Tender Quality Assessment (TQA). The TQA requires an overall method statement and a detailed description of the proposed process and equipment specification, including anticipated productivity in m3/day/hr. These will be scored against the criteria indicated in the TQA.

Katy Reed

Published 2 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete