Widening of the northern footpath at Fleet Pond reservoir, construction of a slipway, replacement of timber footbridge, and resurfacing of Fleet Pond access road and car park

Award

Value

£1,500,000

Classifications

  • Works for complete or part construction and civil engineering work

Tags

  • award

Submission Deadline

3 years ago

Published

2 years ago

Description

Update 22/10/2021: The council acknowledges that the responses to some clarifications have proved more complex, taking longer than we would have liked and in turn has prompted some further clarification. As a result, we have agreed to allow bidders additional time to factor in these updates and will extend the deadline for submissions to 4pm Monday 1 November. All other project deadlines should remain as planned. 

'HDC202107 - Clarifications update 211022' (Update 5) has been uploaded to help address outstanding points of clarification 


Update 19/10/2021: Final clarification responses to questions received are now provided in an additional document uploaded as 'HDC202107 - Clarifications update 211019' (Update 4). Accompanying documentation including the CEMP requested, are also now published in the folder provided to bidders who have requested this previously; 'HDC202107 Fleet Pond' inside the folder: HDC202107- Clarification 4 Docs


Update 14/10/2021: Clarification responses to questions received up to 14/10/21 provided in an additional document uploaded as 'HDC202107 - Clarifications update 211014' Please note this is update 3. An update 4 will be provided to cover outstanding queries received shortly.

Update 07/10/2021: Clarification responses to questions received up to 07/10/21 provided in an additional document uploaded as 'HDC202107 - Clarifications update 211007' 

Update 01/10/2021: Clarification responses to questions received up to 01/10/21 provided in an additional document uploaded as 'HDC202107 - Clarifications update 211001' 

The Council invites quotations to widen the northern footpath of Fleet Pond reservoir; replacement of short-span low level timber and steel bridge, construction of new slipway in northern eastern of the reservoir, resurface the Fleet Pond car park and access road.

Some supporting documentation is restricted to interested bidders only. Please email [email protected] if you need a copy of these. The contract will be run under the NEC4 Engineering and Construction Contract model.

The last date for clarification question submissions is 13 October 2021

See attached Invitation to Tender document for full details of how to apply.

Additional information: Some supporting documentation is restricted to interested bidders only. Please email [email protected] if you need a copy of this.

Update 22/10/2021: The council acknowledges that the responses to some clarifications have proved more complex, taking longer than we would have liked and in turn has prompted some further clarification. As a result, we have agreed to allow bidders additional time to factor in these updates and will extend the deadline for submissions to 4pm Monday 1 November. All other project deadlines should remain as planned. 

'HDC202107 - Clarifications update 211022' (Update 5) has been uploaded to help address outstanding points of clarification 

Update 19/10/2021: Final clarification responses to questions received are now provided in an additional document uploaded as 'HDC202107 - Clarifications update 211019' (Update 4). Accompanying documentation including the CEMP requested, are also now published in the folder provided to bidders who have requested this previously; 'HDC202107 Fleet Pond' inside the folder: HDC202107- Clarification 4 Docs

Update 14/10/2021: Clarification responses to questions received up to 14/10/21 provided in an additional document uploaded as 'HDC202107 - Clarifications update 211014' There are 3 attachments to this update. Please note this is now clarifications update 3. An update 4 will be provided to cover outstanding queries received, shortly.

Update 07/10/2021: Clarification responses to questions received up to 07/10/21 provided in an additional document uploaded as 'HDC202107 - Clarifications update 211007' 

Update 01/10/2021: Clarification responses to questions received up to 01/10/21 provided in an additional document uploaded as 'HDC202107 - Clarifications update 211001'

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Bass Rock Refurbishment 2025 - 2027

We have a provision of refurbishment of Bass rock lighthouse. This lighthouse is situated on a steep crag on the southern entrance to the Firth of Forth off the east coast of Scotland. The island rises out of the sea to a height of 107 metres and it is about a mile in circumference. It is an important nesting ground for seabirds, including 40,000 gannets. The island is accessed from North Berwick by boat with a concrete path leading from the steps at the boat landings up to the lighthouse through the ruins of the Castle walls. We require a competent contractor to carry out the scope of works as below, these are initial requirements and they may be added to in the tender documents. Lighthouse Tower refurbishment - Painting, internal and external – full building externally, decoration internally Glazing repairs – replacing window panes in light room Electrical upgrades – installation of new light, batteries and solar array Installation of HCL on roof dome Safety gates installed Asbestos testing Free issue equipment and detailed scope will be confirmed in the tender documents. External refurbishment Winch house at side of lighthouse tower to be removed, asbestos present in the roof Drainage – courtyard drainage repairs Wall removal Minor repairs to access landing and steps Bird guano removal Full details of the works will be given in the Tender documents. Contractors will need to confirm their competence in working at height, electrical works, and health and safety and environmental management. Due to nature Scotland restrictions in relation to bird nesting, access to Bass Rock for the works can only be between October and January every year. We expect these works to be carried out between these months in both 2025/26 and 2026/27. Access day to day will be by boat from the mainland, to be arranged by the awarded contractor. There are no toilets, overnight or fresh running water facilities on this site. Due to these limited welfare facilities and the PPE required to work on site, the works need to be carried out on site to a maximum of 4 hours per day. We will require all interested contractors to attend a mandatory site visit on 16th July 2025. We expect the following PPE to be supplied by NLB for this site visit – boat suits, breathing apparatus, lifejackets, personal locator beacons (PLB), Manta helmets. Interested suppliers are to wear waterproof footwear and clothing. Timeline Set out below is the proposed procurement timetable. This is intended as a guide and, whilst the NLB does not intend to depart from the timetable, it reserves the right to do so at any time. Issue of Invitation to Tender - 3rd July 2025 Site Visit - 16th July 2025 Clarification deadline - 24th July 2025 Tender return deadline - 6th August 2025 Tender Award - Estimated by mid-end August 2025 Tools and materials to Oban - By 10th October 2025 Contract start - 21st October 2025 To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=963528697

Katy Reed

Published 5 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete