T963 Towers Refurbishment Phase Three - Rayleigh

Complete

Value

£8,000,000

Classifications

  • Construction work

Tags

  • tender

Submission Deadline

2 years ago

Published

2 years ago

Description

The University of Essex (the Authority) invites expressions of interest for participation in a tender process for the refurbishment of the third of six Towers, Rayleigh, at our Colchester campus. 
      The University of Essex has already completed refurbishment works of the first two Towers on the south side of campus and over the coming five years, will refurbish the remaining four towers, on the north side of campus. The refurbishment works will provide more thermally efficient buildings, with all new services, considerably enhancing the student accommodation for many years to come. 
      The project involves the complete removal of almost all elements to the building, only the wall and floor structures will remain intact. The existing services will be fully stripped out including all of the plant serving the building. Both of the existing lifts will be entirely removed, and remedial works undertaken to the lift shafts. All the windows and curtain walling will be removed which will require   a full scaffold to the entire building. 
      The roof will need to be replaced with the addition of thermal insulation. Added to this, internal services are failing and a major refurbishment is required in order to ensure the towers can be certified as 'safe to occupy' under the Building Safety Act and to maintain the life of the asset and preserve it for future years. The towers blocks are classed as 'higher risk' buildings under the Building Safety Act which was granted Royal Assent on the 28 April 2022. Work needs to begin as part of this project on preparing safety cases for all accommodation coming into the remit of the pending legislation.
      All new services are to be installed with a considerable amount of design consideration to reflect the way in which students live and operate within the building. For example, the introduction of mechanical ventilation to all communal areas and student bedrooms. The building will have a new fire detection system, combined with an all new misting sprinkler system throughout. Fire compartmentation will be given great attention both horizontally and vertically through the building. The project will also deliver new fire-fighting lifts. Within the design brief the ethos has been to implement high levels of protection to life of the occupants and to enhance the fire strategy for the building.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Wormwood Scrubs Masterplan Biodiversity & Improvement Works

London Borough of Hammersmith and Fulham Council (the “Council”) is seeking a supplier who is suitably qualified and experienced in landscaping and the creation and management of ecologically sensitive habitats. Wormwood Scrubs is an open space located at the northern end of the London Borough of Hammersmith and Fulham. It is the largest open space in the Borough, at around 80 ha (200 acres), and is one of the largest areas of common land in London. The work is to implement the proposals in the AEM (Alternative Ecological Mitigation) Masterplan for Wormwood Scrubs open space. The overall objective of the AEM Masterplan is to improve and enhance biodiversity on the Scrubs and at the same time improve drainage across the site to better manage surface water and improve access. The work is split into two phases: Capital works – this phase of work should be completed in 6-8 months and will include the creation of a SUDs (Sustainable Urban Drainage scheme) made up of a series of scrapes and swales to the south of the site and the northwest corner of the site. Retention ponds will be created in the existing wet woodlands in the southeast of the site. Tree planting will take place at various locations and existing vegetation will be improved along with the creation of meadows and grasslands. Hibernacula’s will be created and bird and bat boxes installed. Maintenance and Management Plan (MMP) – Phase 2 of the work will be a 10 year Management and Maintenance Plan (MMP) which will include the management of the features implemented as part of the Phase 1 Capital Works including the SUDs scheme and meadows and will also involve the management of the existing woodland, scrubland and meadows that have not previously been regularly managed and are in need of ongoing management to improve conditions for wildlife and increase biodiversity. For example, selective thinning in woodland areas will allow more light in to allow a greater variety of woodland plants to grow in the understorey.

Katy Reed

Published 4 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete