WAV PT Architect and Consultant services – Cranleigh Leisure Centre new build project

Complete

Value

£2,000,000

Classifications

  • Architectural and related services
  • Architectural, engineering and planning services

Tags

  • tender

Submission Deadline

2 years ago

Published

2 years ago

Description

Waverley Borough Council (WBC) requires the services of an architect/lead consultant, together with associated professional services aligning to all RIBA Plan of Work Stages 0-7, to develop a design and technical specification for a new low carbon leisure facility replacement (Cranleigh Leisure Centre (CLC)).  The Architect will act as the Lead Designer for design related matters and will coordinate and integrate the work of other consultants however employed. The CLC investment aims to deliver a new leisure facility for Cranleigh that will meet the demands of the local community, in terms of facility mix, but also deliver a low carbon building in accordance with Waverley’s net zero carbon by 2030 commitment. The values stated and attributed to this contract are indicative only and are based on costings compiled in 2021 so may be considerably different (higher or lower) than advertised. Bidders should refer to the specification for the full scope of services.

Similar Contracts

Open

Collett Park Gateway

The Collett Park Gateway project is an opportunity to reconfigure the park's western gateway making a fresh and exciting contribution to the town. Shepton Mallet Town Council (SMTC) wish to appoint a design team to work collaboratively to bring imaginative, sustainable design to this pivotal site. Improving the arrival to this important public park will enhance users experience and attract greater footfall to the park year round, serving a growing local population. It will provide an attractive café and amenities with good indoor, outdoor connectivity between spaces. It will improve accessibly and active travel connections marking the beginning of the extended Strawberry Line the cycle route and multi user path to Wells and Clevedon. The project is led by a working party of Town Councillors and should continue to be informed by active stakeholder and public engagement. Project Aims • To improve the facilities at the park, providing better experience for park users and residents. • To support economic regeneration encouraging greater footfall to the town through the year. • To make the park gateway more attractive, accessible and sustainable. • To support people's health and well-being, bringing people in contact with one another and nature. • To mark the beginning of the Strawberry Line enabling active travel and recreation. 3.2 Project Outcomes The proposed indoor and outdoor spaces should maximise the potential of the site, creating a renewed sense of place whilst contributing to character, natural beauty and heritage of the park in an inclusive, fresh and innovative way. Proposals should include: • A safer, more welcoming, accessible and well-connected park entrance that reflects the significance of the park in the town and is attractive to passers-by. • Modern and accessible toilets that meet the needs of the volume and diversity of park users, that may if feasible, include a Changing Places standard room. The toilets should operate separately from the café and be able to be locked remotely to extend opening hours. • Improved café appearance and function with the capacity to also serve outdoor/ takeaway refreshments at busy times of the year. Options to include as feasible: > An updated, expanded kiosk with a covered outdoor area. > An indoor space for around ten to fifteen covers. > An area to be used as a community space e.g. for small meetings, workshops or events at quieter times. • Tool storage and a small vehicle garage for the maintenance team. Store for four commercial refuse and three wheely bins. • Collett Park and Strawberry Line signage. • The re-siting of existing amenities as needed such as; the water fountain, existing park signs and defibrillator. • The potential to develop areas of soft landscape elements with the park community over time. • A welcoming space for cyclists at the beginning of the Strawberry Line with improved cycle connections from the Strawberry Line to Park Road and the town centre. The building and outdoor spaces should be robust and sensitively lit and become part of the regular maintenance of the park. It is likely that the cafe will continue to be leased by an operator and not run by the Town Council. Outline Programme Jan Feb 2026 Design Team Appointed Feb / April 2026 RIBA Stage 2, Develop Concept Design & Make Pre-Application Enquires May / June 2026 Visualise possibilities and engage the public. July / Oct 2026 RIBA Stage 3 & Planning Application 2027 RIBA Stage 4 and Tender & Start on Site.

Katy Reed

Published 19 hours ago
Open

PROPOSED COMMUNITY SPORTS FACILITY AT LAURELVALE

Tenders are invited from suitably qualified Consultancy firms for the Design and Project Management of a new Cricket and Community Hub on the existing site of Lauralvale Cricket Club 25 Mullavilly Rd. Tandragee, BT62 2LX. Since 1875 the grounds and facility has provided the focus for many village activities and functions. The club has just celebrated 150 years existence, and to mark this the Committee want to secure a viable long-term future for this established club and develop the facilities and activities that take place there. Over the years due to its location in the centre of the villages of Laurelvale and Mullavilly, many activities other than cricket now take place within the grounds. There is a real need to build a new, fit for purpose facility to host these activities. This capital project will kickstart the first phase of the club’s vision - the building of a new community hub and changing facility adjacent to the current cricket pitch ground (Building B) This new single storey building will have a multi-use space where groups will meet and during the cricket season will also act as changing rooms. It will also have a disabled toilet and baby changing facilities. The new facility would allow for more programming of indoor activities, longer opening hours. Increase in usage of the facility will lead to increased revenues, all of which will be ploughed back into maintaining and developing other facilities in the club’s vision. Council wishes to develop this project with a consultant.

Katy Reed

Published 3 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete