BBV HS2 MWCC North - Deep Drainage - Micro Tunnelling (WP/CM)

Award

Value

£1

Classifications

  • Coal or rock cutters and tunnelling machinery, and boring or sinking machinery

Tags

  • award

Submission Deadline

3 years ago

Published

1 year ago

Description

Balfour Beatty VINCI (BBV) have been awarded HS2 main works civils contracts, lots N1 and N2. 
      
      We are looking to engage with the supply chain whom provide Deep Drainage/ Micro Tunnelling works.
      
      This package of works includes two pipeline runs to be installed. The two pipes are different in diameter, one being 600mm & the other is a 1500 mm.  
      
      The length of 1500 mm pipe featured is approximately 1190 metres. The peak depth of the install features at 11.90 metres BGL.
      
      A 600 mm pipe is also featured and this will also convey waters between the Marston Lane inlet, to an outlet planned at the rear of the Kingsbury Compound settlement pond.  
      
      
      Full details and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of works, prior to completing this expression of interest (EOI).

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Matt Munn

[email protected]

7530492643

Timeline complete

Publish
Bid
Evaluate
Award
Complete