RBGKEW1057 ICW Quantity Surveyors Framework

Award

Value

£0

Classifications

  • Construction work
  • Quantity surveying services

Tags

  • award
  • contract

Published

2 years ago

Description

Consultant Framework (Quantity Surveyor)
At
Royal Botanic Gardens Kew
RBGKEW1057
The Board of Trustees of the Royal Botanic Gardens ("RBGKEW") wishes to establish a framework to undertake Quantity Surveying support required to help develop, design and deliver projects within its programme of projects.
Though considerable improvements have been made in the last few years, RBG Kew currently has a significant defect liability that requires action. The extent of the backlog and a method of identifying the most urgent works was drawn-up in 2018 via the completion of a site wide elemental condition survey and risk assessment. This piece of work of has been built-on and aligned with RBG Kew's Sustainability and Energy Plans, which are targeting a carbon positive estate by 2030, to create a new five-year programme of work across the two estates.
This programme consists of infrastructure improvement, refurbishment, and conservation projects. Though not all the projects within the programme relate to listed or protected assets, conservation knowledge and design experience is required to ensure the projects are developed in a sensitive way, respectful of RBG Kew's status as a world Heritage Site.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Homes England - Haul road, enabling and accommodation works at Attleborough Sustainable Urban Extension (SUE), Norfolk

Homes England requires a contractor to undertake enabling works at Attleborough Sustainable Urban Extension (SUE) in Norfolk. This contract will be an NEC4 Engineering and Construction Contract (Option A) requiring the construction of a 2.4km long haul road/maintenance track with associated surface water drainage, and other enabling works including power supply and S104 foul sewer (subject to planning) at Attleborough Sustainable Urban Extension. In brief, the scope includes: • Construction of haul road and maintenance track • Surface water drainage for haul road and maintenance track • Enabling works for proposed UKPN power supply • Cadent gas main protection • Anglian Water rising main investigation and protection • Vegetation clearance • Field access accommodation works (gates, fencing, field access points) • Archaeological monitoring • Foul sewer construction (to be confirmed – subject to planning approval and programme) Please note: - The dates stated in this notice are for the initial works and may be extended to include additional works (for example, the foul sewer). The dates for this additional work would be agreed with the successful contractor so cannot be quantified at this point. This is clearly identified in the tender documents. - The value stated in this notice is the midpoint of a range between £1,000,000 - £1,500,000 (exclusive of VAT). - The value stated in this notice is for the initial works and may be extended to include additional works (for example, the foul sewer). It is expected that the full contract value is estimated at approximately £3,000,000 (exclusive of VAT). Any additional works are clearly identified in the tender documents. A previous notice has been issued for this procurement on Contracts Finder, prior to the new Regulations. This can be found on Contracts Finder with the reference number HCA001-DN707505-51989851.

Katy Reed

Published 2 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete