DFI 3233014 – SHIMNA FLOOD ALLEVIATION SCHEME

Unknown

Value

£0

Classifications

  • Works for complete or part construction and civil engineering work

Tags

  • tenderUpdate

Published

3 years ago

Description

The project is for the provision of Shimna Flood Alleviation Scheme. The Economic Operator Team (EOT) will complete the construction of a fluvial flood defence in Newcastle, with an envisaged construction period of 12 months. The flood defence extends both upstream and downstream from New Bridge on the Bryansford Road and is approximately a total length of 1.45km comprising a combination of sheet pile flood walls (approx. 0.45km), secant pile flood walls (approx 0.89km) and piled earth embankments (approx. 0.11km). The EOT will be responsible for the final detailed design of the secant piles and sheet piles. Additionally, the works include the demolition of a number of property boundary walls and fences, the Relocation of a drainage ditch, construction of new pathways, wall cladding, a retaining wall, back drainage, landscaping, the erection of a flood gate and River works to MEMORANDUM OF INFORMATION PART B The EOT will also be responsible for Landowner and Stakeholder consultations ensuring necessary permissions, licences, permits, consents and approvals.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Contract 1 - Heating Installations - Programmed Works - 2025-27

The Authority invites suitably experienced Principal Contractors for the above Framework to provide a skilled service and provide the works for Heating Upgrades and Replacements This Framework Contract will ensure the availability of skilled Contractors to deliver the above Framework, requiring differing values and complexities as required during the Framework Contract. The Authority will require the successful Framework Suppliers to be acting the capacity of Principal Contractor under CDM regulations 2015 and the Authority will be the Client. The successful Framework Suppliers will be required to work together with North Tyneside Council (the Authority) to drive improvements and support the aims and ambitions of the Contract.. The following are the industry Standard Accreditation's required for this Framework and are a pass/fail question in the Standard Selection Questionnaire (SSQ) included in the full Tender documents: Gas Safe with ACS qualification and NICEIC or NAPIT The initial duration is for 2 years with up to 2 x 12 months extension at the sole discretion of the Authority. It is envisaged that 3 (three) successful Contractors will be appointed to the Framework. The main areas of activity may comprise of, but not exclusively be limited to; programmes or individual projects including housing/residential installing gas fired central heating systems and carrying out associated works for programmed works which are to be completed in ether of the following forms; houses, flats, bungalows and blocks and any other properties owned by the Authority or its subsidiaries which may also include housing for sale. Interested Suppliers must access the Tender documents for further information, which are available to download immediately after registering an interest in the North Eastern Procurement Organisation (NEPO) new ' OPEN' Portal system.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Procurement Operations Branch

[email protected]

+44 2890816555

Timeline unknown