DFI 3233014 – SHIMNA FLOOD ALLEVIATION SCHEME

Unknown

Value

£0

Classifications

  • Works for complete or part construction and civil engineering work

Tags

  • tenderUpdate

Published

3 years ago

Description

The project is for the provision of Shimna Flood Alleviation Scheme. The Economic Operator Team (EOT) will complete the construction of a fluvial flood defence in Newcastle, with an envisaged construction period of 12 months. The flood defence extends both upstream and downstream from New Bridge on the Bryansford Road and is approximately a total length of 1.45km comprising a combination of sheet pile flood walls (approx. 0.45km), secant pile flood walls (approx 0.89km) and piled earth embankments (approx. 0.11km). The EOT will be responsible for the final detailed design of the secant piles and sheet piles. Additionally, the works include the demolition of a number of property boundary walls and fences, the Relocation of a drainage ditch, construction of new pathways, wall cladding, a retaining wall, back drainage, landscaping, the erection of a flood gate and River works to MEMORANDUM OF INFORMATION PART B The EOT will also be responsible for Landowner and Stakeholder consultations ensuring necessary permissions, licences, permits, consents and approvals.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Penwith Gallery Studios 1-3, Reactivating the Creative Spaces

The Penwith Gallery is the home of the Penwith Society of Arts in Cornwall. The Gallery, formerly an old pilchard packing factory, has a remarkable complex of buildings, including three public galleries, artists' studios, a print workshop, a sculpture courtyard, shop and archive.The Society was founded in 1949 by Barbara Hepworth, Ben Nicholson, Peter Lanyon, Bernard Leach, Sven Berlin and Wilhelmina Barns-Graham, amongst others. This association with so many progressive and influential artists has given the Penwith Society a unique place in British art history. A charitable company - Penwith Galleries Ltd - was created to arrange the programme of exhibitions, execute all gallery business and manage the entire complex. Today the Penwith offers a year-round programme of exhibitions by Society Members and Associates, as well as those by other artists from Cornwall and further afield. The Penwith continues to be at the forefront of presenting contemporary work of quality. Our project will involve the reconfiguration and reactivation of space currently occupied by three of our eleven artists' studios above the main gallery. The studios are situated in what was formerly St Peter's Loft, Peter Lanyon's school of painting. Studios 1 and 2 are no longer fit for purpose and have been redundant for some time. They need reboarding with additional fireproof materials, and studio 1 is in need of proper fire exit access. The two studios share a site with Studio 3 which is the long-term home of the Porthmeor Printmakers Workshop. This space is still in use as a working and teaching space at present but requires significant works in order to continue to be a viable site in the future. Boards need replacing here too and proper toilet facilities need to be installed to replace the inadequate current amenities, and the layout itself is poorly arranged with a lot of dead space which could be repurposed to better effect. We intend to reconfigure the layout across all three current studios, moving Studio 1 to the other end of the Print Workshop, building a fire corridor, moving and improving the Printmakers Workshop office space and creating a fourth studio for a new artist tenant. We propose beginning the works in December 2024 during the gallery closure and completing the works by March 2025

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Procurement Operations Branch

[email protected]

+44 2890816555

Timeline unknown