Fast Charging Battery Train Trial
Value
£0
Suppliers
Classifications
- Transport services (excl. Waste transport)
- Transport equipment and auxiliary products to transportation
Tags
- award
- contract
Published
2 years ago
Description
Trial to prove the capability of a battery powered train, supported by fast charging equipment, to safely and reliably operate passenger services on a non-electrified branch line (West Ealing-Greenford), for a period of at least one year. This trial will support the objectives of the Traction Decarbonisation Network Strategy and will be delivered with the support of Network Rail and the Department for Transport. The route from West Ealing to Greenford is 2¾ miles of mostly double track railway and is served by a two car Turbo stopping at all stations. Trains are Driver Only Operated using a combination of CCTV, mirrors and look back during train despatch. The shortest platforms on the route that the train will need to serve, are at Castle Bar Park, and are 47.5m and 47.6m long. GWR does not operate trains without toilets on board.
Similar Contracts
AI Bid Assistant
Our AI-powered tool to help you create winning bids is coming soon!
Timeline complete
Complete