Campbeltown Flood Protection Scheme Works

Complete

Value

£0

Classifications

  • Flood-prevention works
  • River regulation and flood control works

Tags

  • tender

Submission Deadline

3 years ago

Published

4 years ago

Description

Argyll and Bute Councils’ aims and objectives for the Campbeltown Flood Protection Scheme Works are to:
- Reduce the risk of river flooding in Campbeltown
- Reduce the risk of surface water flooding in Campbeltown
The scope of the contract is:
- Millknowe Flood Storage Reservoir – Construction of an impounding structure across the river and floodplain, flow control culvert and spillway. Sheet pile flood walls will form part of the storage area to protect the industrial estate.
- Dalaruan Culvert Upgrade – Partial upgrade to increase capacity for the Millknowe and Balegreggan Burns. Upsize a 270m length from the Millknowe intake. Pipe diameters will be increased to between 675 – 1200mm.
- Surface Water Elements – Retrofit of Sustainable Urban Drainage Systems, within urban setting, to reduce load on the combined drainage network. Providing new drainage lines for existing road drains to disconnect from the combined network. Two detention basins and two filter drains are to be provided in above ground storage in the Meadows and below ground tank type storage at Burnside car park.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Flood Cell 06, Snape Maltings

The Upper Alde & Ore Estuary Embankment Improvements scheme will reduce tidal flood riskand enhance the environment in the Upper Alde and Ore Estuary. The Alde and Ore Estuary is vulnerable to flooding from the sea made worse by the poor condition of many of the flood defences. The proposed Flood Cell 06, Snape Maltings scheme is 1 of 4 cells identified to improve the Standard of Service of the existing flood defences and provide resilience to withstand 300mm of overtopping from a 1:200+ year event, given predicted sea levels in 2050. The Client is theEast Suffolk Water Management Board. In summary, the scope of Works for the project includes civil engineering works (but is not limited to):  Establish main site offices, compound, temporary services and access routes.  Alliance House - Installation of approximately 20m of new demountable defences along the quay side with piled and concrete slab foundation;  River Alde Quay - Installation of approximately 120m of new demountable defences along the northern quay side with piled and concrete slab foundation;  Henry Moore Lawn - Improvement to approximately 80metres of earth flood embankment to be constructed in a passive fashion to provide improved flood protection and amenity and access value around the Henry Moore Lawn area terminating at the northeastern edge of the Concert Hall building; and  Terrace Car Park - Improvement to approximately 100metres of earth flood embankment, incorporating pedestrian access provision, constructed from the River Cafe terrace area, terminating into the southeast car park area. The works are estimated to cost around £2.3million. The form of contract will be a NEC4 ECC Option A. All tender documents are available through the Client or the Client's appointed tender and contract manager Stantec UK Ltd.

Katy Reed

Published 1 week ago
Open

Flood Cell 06, Snape Maltings

The Upper Alde & Ore Estuary Embankment Improvements scheme will reduce tidal flood riskand enhance the environment in the Upper Alde and Ore Estuary. The Alde and Ore Estuary is vulnerable to flooding from the sea made worse by the poor condition of many of the flood defences. The proposed Flood Cell 06, Snape Maltings scheme is 1 of 4 cells identified to improve the Standard of Service of the existing flood defences and provide resilience to withstand 300mm of overtopping from a 1:200+ year event, given predicted sea levels in 2050. The Client is theEast Suffolk Water Management Board. In summary, the scope of Works for the project includes civil engineering works (but is not limited to):  Establish main site offices, compound, temporary services and access routes.  Alliance House - Installation of approximately 20m of new demountable defences along the quay side with piled and concrete slab foundation;  River Alde Quay - Installation of approximately 120m of new demountable defences along the northern quay side with piled and concrete slab foundation;  Henry Moore Lawn - Improvement to approximately 80metres of earth flood embankment to be constructed in a passive fashion to provide improved flood protection and amenity and access value around the Henry Moore Lawn area terminating at the northeastern edge of the Concert Hall building; and  Terrace Car Park - Improvement to approximately 100metres of earth flood embankment, incorporating pedestrian access provision, constructed from the River Cafe terrace area, terminating into the southeast car park area. The works are estimated to cost around £2.3million. The form of contract will be a NEC4 ECC Option A. All tender documents are available through the Client or the Client's appointed tender and contract manager Stantec UK Ltd.

Katy Reed

Published 1 week ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete