Eastleigh Post Office Project

Complete

Value

£0

Classifications

  • Works for complete or part construction and civil engineering work

Tags

  • tender

Submission Deadline

4 years ago

Published

4 years ago

Description

Eastleigh Borough Council (EBC) has acquired the former Eastleigh Post Office site and has secured planning permission for the demolition and redevelopment of the site. The works involve:
Principal Contractor (CDM 2015);
Design development and full design responsibility including Principal Designer (CDM 2015) and discharge of all planning conditions;
Site establishment, securing of boundaries and maintaining safe pedestrian and vehicular access;
Isolate and terminate all existing utility supplies and provision of new supplies for the development;
Removal of all residual rubbish, fly tipping etc both internally and externally;
R&D asbestos survey of the Sorting Office section of the building;
Removal and clearance of all asbestos containing materials;
Demolition of existing buildings, removal of hardstanding and excavation to required levels;
Construction of foundations and service routes;
Construction of the two new buildings including:
Front Block - 1 Nr Commercial unit on the ground floor, 10 residential units to the upper three floors, Residential bin and bike stores;
Rear Block - 1 Nr Commercial unit on the ground floor, 18 residential units to the upper five floors, Residential bin and bike stores;
Separate commercial bin and bike store;
All mechanical and electrical installations within the building;
Construction of the Public Realm comprising hard and soft landscaping building;
Alterations to all below ground drainage and connections.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Church Lane Car Park Drainage

To install 3 large drainage soakaways in grass verges surrounding the car park. Site welfare, herras fencing etc. Clear vegetation from works areas and dispose to licenced facility. Locate utilities within the works area and divert if necessary (local electric cable likely). Take up existing kerbs as required, and set aside for re-use. Construction of soakaway 1: Excavate existing surface to formation level and dispose of surplus to licenced facility, Import, lay and compact sand / gravel surround on Terram 1000, Lay infiltration crates wrapped in permeable membrane, with access module, Backfill with Type 3 aggregate, Lay geogrid (Bodpave 40 or similar approved) complete with gravel infill and topsoiled verge, Relay 5Lm of bullnose kerb. Construction of soakaway 2: Excavate existing surface to formation level and dispose of surplus to licenced facility, Import, lay and compact sand / gravel surround on Terram 1000, Lay infiltration crates wrapped in permeable membrane, with access module, Backfill with Type 3 aggregate, Lay permeable membrane and topsoil around access cover, Install MD200 channel drain and 100mm outfall pipe. Construction of soakaway 3: Excavate existing surface to formation level and dispose of surplus to licenced facility, Import, lay and compact sand / gravel surround on Terram 1000, Lay infiltration crates wrapped in permeable membrane, with access module, Backfill with Type 3 aggregate, Lay geogrid (Bodpave 40 or similar approved) complete with gravel infill and topsoiled verge, Relay 11Lm of hit & miss half batter / bullnose kerb. Make good carpark pavement (including chipping) around works areas to match existing. Site clearance, make good carpark pavement (including chipping) to match existing, inspections etc. PROVISIONAL RATES: Excavate 300mm subsoil and dispose of surplus to licenced facility. Import, lay and compact 300mm thick 6F1/6F2 capping layer. Lay tarmac surface reinstatement (assume same construction as existing 70mm tarmac over 300mm type 1, including chipping) beyond extended section. Import and lay 150mm thick topsoil with grass seed. Supply new HB2 kerbs, and lay including haunching. Supply new BN kerbs (25mm upstand), and lay including haunching.

Katy Reed

Published 4 days ago
Open

Main Contractors Framework 2026

LSHTM Framework for Main Contractors, to procure works across all campuses of its estate, broken out into the following Lots: Lot 1 – Main Contractor - Carry out construction projects, either as traditional single stage or design and build. Lot 2 – Mechanical, Electrical and Public Health (MEP) Contractor – Predominantly in relation to either large plant replacement, or large scale replacement of for instance light fittings, or distribution pipework but may also cover simple external and internal refurbishment works. With an estimated total value of LSHTM capital projects over the life of the Framework of between £15,000,000 and £63,000,000 GBP based on up to £60,000,000 for lot 1 and up to £3,000,000 for lot 2. These figures cannot in any circumstances be guaranteed and nor should they be taken as a minimum or maximum amount. Typical call-off contract values range from £250,000 - £10,000,000 for lot 1, and £10,000 to £150,000 for lot 2. Please note that refurbishment work in the laboratories is of a highly technical nature, requiring extensive relevant skills and experience. In addition, the refurbishment works generally take place in occupied buildings with other research activities ongoing nearby, requiring careful planning and execution of the works so that no research is interrupted. Due to the criticality of these research activities an ability to react and resource promptly to address technical issues that threaten research continuity is required.

Katy Reed

Published 2 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Mr Andrew Wright

[email protected]

+44 7384875642

+44 20794760000

Timeline complete