CHIC Compliance Audit Services Framework 2021

Complete

Value

£150,000,000

Classifications

  • Auditing services
  • Activity specific environmental auditing services
  • Asbestos removal services
  • Gas distribution and related services
  • Electrical services
  • Electrical installation work
  • Safety consultancy services
  • Lifts
  • Hoists
  • Engineering design services for mechanical and electrical installations for buildings
  • Water installations

Tags

  • tender

Submission Deadline

3 years ago

Published

3 years ago

Description

The framework will provide a range of internal policy compliance and site portfolio audits along with site contractor assurance audits, as applicable. Audit work should be carried out to a professional standard by appropriately qualified personnel, including demonstrable knowledge of Registered Social Landlords, the Housing Regulator and their Regulatory Framework and Standards. The audit process will be an integral part of management systems and control, to ensure that works are completed to a defined scope/specification of works in line with the member’s requirements whilst complying with legislative and member policy requirements.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

The Wallace Collection Masterplan - Building Services Engineer and Sustainability Consultant

The Wallace Collection (TWC) is seeking to appoint a Building Services Engineer and Sustainability Consultant for a significant re-development project as part of TWC’s Masterplan. The completion of a full RIBA Stage 4 design is required, along with RIBA Stage 5/6/7 services. Tenderers must demonstrate sufficient capability to support the procurement and delivery of the project at the Wallace Collection in Westminster, London. The Building Services Engineer’s scope includes the design of mechanical, electrical, and public health services, and coordinating below-ground drainage with the Structural/Civil Engineer. It also involves integrating electrical and data cabling specified by specialist consultants (e.g., IT/AV, security, fire, and catering) and addressing catering-related electrical, ventilation, and drainage needs. Additionally, the scope covers vertical transport systems and ambient/emergency lighting, ensuring alignment with architectural and exhibition lighting designers’ requirements. The Sustainability Consultant will lead the development and implementation of the project’s sustainability framework, ensuring alignment with the Client's objectives and compliance with relevant legislation and standards. The scope includes acting as the BREEAM Accredited Professional and Assessor, guiding the integration of sustainability measures into the design and construction phases, and coordinating with stakeholders, including the BRE and planning authorities.

Open

Audit of the Data Communications Company (DCC)

Under the Operational Performance Regime (OPR) contract management incentive, the auditor assesses the DCC's management of its contracts. The auditor is tasked with using the scope listed in the most up to date version OPR Guidance document to assess DCC's contract management performance against the National Auditing Office (NAO) Framework.Main tasks:*Assessment of DCC's commercial activity over the course of the Regulatory Year.*The auditor will provide a score of DCC's performance using the NAO Framework. Ofgem will use these scores to determine the final score to be awarded to DCC.The audit will run on an annual basis and have four main stages:*Evaluation stage - This will run for around six weeks where the auditor will carry out an assessment of DCC's commercial activity in the Regulatory Year. The auditor will provide DCC with an interim report which will contain a score and rationale against each supporting question against the NAO Framework.*Reporting - The auditor will provide a draft report to the Authority which will include DCC's level of attainment against the NAO Framework. The Authority may ask for iteration of the report before the final version is produced and shared with us.*Consultation stage - The Authority will publish a summary of report findings and consult on this - no further action is required from the Consultant at this stage.*Decision - The Authority will consider the responses from stakeholders on the consultation and determine DCC's retained margin. We may ask the Consultants for further clarification around the scores during this stage.

OFGEM

Published 1 day ago
Open

Audit of the Data Communications Company (DCC)

Under the Operational Performance Regime (OPR) contract management incentive, the auditor assesses the DCC’s management of its contracts. The auditor is tasked with using the scope listed in the most up to date version OPR Guidance document to assess DCC’s contract management performance against the National Auditing Office (NAO) Framework. Main tasks: *Assessment of DCC’s commercial activity over the course of the Regulatory Year. *The auditor will provide a score of DCC’s performance using the NAO Framework. Ofgem will use these scores to determine the final score to be awarded to DCC. The audit will run on an annual basis and have four main stages: *Evaluation stage – This will run for around six weeks where the auditor will carry out an assessment of DCC’s commercial activity in the Regulatory Year. The auditor will provide DCC with an interim report which will contain a score and rationale against each supporting question against the NAO Framework. *Reporting - The auditor will provide a draft report to the Authority which will include DCC’s level of attainment against the NAO Framework. The Authority may ask for iteration of the report before the final version is produced and shared with us. *Consultation stage – The Authority will publish a summary of report findings and consult on this – no further action is required from the Consultant at this stage. *Decision – The Authority will consider the responses from stakeholders on the consultation and determine DCC’s retained margin. We may ask the Consultants for further clarification around the scores during this stage.

OFGEM

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete