SBC Local Coastal Slope Monitoring Analysis & Interpretation - Analytical Services 2021-27

Award

Value

£98,433

Suppliers

Classifications

  • Geotechnical engineering services

Tags

  • award
  • contract

Published

3 years ago

Description

The overall objective of this project is to enable sustainable management of risks on coastal slopes to people, the developed, natural and historic environment from coastal slope instability over the next six years.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Framework for Site Investigation and Materials Testing Services

Dorset Council has a requirement for site investigation and materials testing services in the delivery of construction/maintenance projects. The requirements include; • Field and laboratory testing of civil engineering materials (including but not limited to; bituminous materials, aggregates, concrete), geotechnical site investigation and soils testing which will require factual and interpretative reporting. • Geo-environmental site investigation and testing which will require factual reporting, interpretative reporting and risk assessment. • Investigation of existing highways and structures (including but not limited to core sampling of carriageways and structures). • Provision of specialist advice and representation (on materials, pavement design and geotechnical/geo-environmental matters) The requirements are primarily for Dorset Highways however other areas of the Council share the requirements. The Council is looking to establish a multi-supplier Framework agreement for provision of the services. The Framework will also be accessible to Bournemouth, Christchurch and Poole Council, who are named in the Tender Notice. A maximum of 4 suppliers will be awarded on to the Framework Agreement. During the term of the Framework, call-off orders will be placed by means of direct award or further competition. The advertised value of the Framework is estimated is based upon the Councils’ estimated needs over the full Framework term however this may change due to changing needs and circumstances during the Framework term: This may include expansion of the scope, budget, or duration if additional services are needed or may include reduction of the scope, budget, or duration if circumstances change, such as reduced funding, lower-than-expected demand, or strategic shifts.

Dorset Council

Published 3 days ago
Open

Infrastructure Maintenance and Improvements

Southend-on-Sea City Council ("the Authority") is seeking expressions of interest from suitably qualified and experienced organisations to maintain, manage and improve its highway network and associated assets. The key objectives are outlined as follows: Ensuring the network is safe for users, as far as is reasonably practicable. Maintaining the value of the infrastructure assets to ensure sound financial management. Maintaining the visual appearance of the network in Southend-on-Sea. Maintaining availability of the highway network so that highway users are free to travel with minimal disruption due to works being undertaken, or due to failure to properly manage the assets. Minimising disruption so that those living and working in Southend-on-Sea suffer minimal disruption from works being undertaken on the highway. Scope including but not limited to: Undertake the role of the Principal Contractor under the CDM Regulations. Collaborating with the Service Manager to determine the optimum levels of service to be carried out in any given year. Providing and managing people, plant and materials and other resources, including suppliers and specialists, to match the level of service required by the Service Manager. Integrating systems and processes with those of the Service Manager to improve efficiency and effectiveness of the core maintenance service. Providing timely and accurate data to inform and support and justify the contract performance measurements. Assisting the Service Manager in the management of, and communication with, those affected by the activities being undertaken in the core service. Helping the Service Manager to manage network occupancy effectively thorough compliance with the Traffic Management Act and New Roads and Street Works Act, including providing all necessary notifications within the appropriate timescales. Supporting the Service Manager in undertaking the various duties as part of the Coastal Protection & Lead Local Flood Authority roles. Cooperation with others carrying out work for the Service Manager to optimise the delivery of the overall services. Maintaining and providing contemporary records of work carried out in electronic format agreed by the Service Manager from time to time. In the course of the work, collecting and providing inventory and ‘as-built‘ records requested by the Service Manager. Maintaining a supply chain of specialist contractors for implementation of specialist products on an ad-hoc basis. Confirming the presence of utilities plant and apparatus on site. Managing work with economy and efficiency in mind. Interested applicants are directed to Sections 11.2.4 and V.1.3 below for further details in relation to the Contract.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete