EPNCSL - Materials Supply and Managed Services

Complete

Value

£37,763,092

Classifications

  • Construction materials and associated items
  • Hire of agricultural machinery with operator
  • Hire of construction and civil engineering machinery and equipment with operator
  • Power tools
  • Hand tools
  • Hire of mowers or agricultural equipment with operator
  • Refuse skips
  • Pneumatic or motorised hand tools
  • Tools

Tags

  • tender

Submission Deadline

3 years ago

Published

3 years ago

Description

A new contract to supply materials, tools, equipment, waste disposal and a managed service to Norwich City Services Limited, a company wholly owned by Norwich City Council.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Vessel First Fill

NLB have a requirement for a supplier to manage the purchase of various items for our new vessel currently being built in Spain. The Vessel First Fill Spreadsheet provides a full list of all required items, one key aspect is the quality of the products that are offered. NLB are looking for the successful supplier to manage the complete process from the purchase of all items to the management of the delivery to the yard in Spain including the Customs process. Please note that NLB are looking for high quality products from known manufacturers. As per the evaluation criteria the higher weighting is on quality over price. On the excel pricing document items have been marked up with makes/models/brand and specific information to provide guidance on the required standard of quality of products. Where an equivalent item is being quoted, this should be highlighted on the comments section of the vessel first fill spreadsheet within your tender reply. Regulations and Standards All items are for use in a UK registered vessel. Where applicable these items must meet IMO and MCA rules in regulations. Examples being all safety equipment and all upholstered furniture, bedding to meet the UK Marine Equipment Regulations (MER) and flame retardant. For reference: MSN 1874 The lifting gear will all have to comply with the Merchant Shipping and Fishing Vessels (Lifting Operations and Lifting Equipment) Regulations 1998 (with 2006 amendments) (LOLER) All standards as detailed within the links to suggested products on the vessel first fill spreadsheet. For example to meet BS EN Codes of practice All batteries for example AA, AAA must be have Nordic Ecolabel Standard. Delivery All items to be delivered at the given destination on 11 August 2025. If any item cannot be delivered within this time then there should be a delivery submitted for these items. All shipping, transportation, import duty, taxes, fees and all other costs are to be included in your submission. The delivery must go directly to the below address: Astilleros Gondán S.A - Warehouse Pol.Industrial Barres C/Regueira(70,73 78,81) 33794 Castropol Asturias, Spain For more information about this opportunity, please visit the Delta eSourcing portal at: https://nlb.delta-esourcing.com/tenders/UK-UK-Edinburgh:-Marine-equipment./RD762364FW To respond to this opportunity, please click here: https://nlb.delta-esourcing.com/respond/RD762364FW

Katy Reed

Published 1 day ago
Open

The provision of Mobile Plant Equipment Hire & Maintenance - Hornsey Street

The Contractor shall provide the following service to the Client for the duration of the service period: The contract term shall be for three (3) years with the option to extend for a further two (2) years. [1 x Volvo L90H] Loading Bucket Tip of lip bucket 4.5m capacity with trash guard RUBBER BLADE 48" - Medium 911M 1" Lock Washers - Medium Blade (qty: 13) PLOUGH BOLT 1 x 4 (qty:13) PLOUGH NUT 1 " (qty: 13) Windscreen Cage Protection to fully protect the operator from debris falling from the bucket whilst maintaining maximum all round visibility. Roll Over Protective Structures (ROPS) & Falling Object Protective Structure (FOPS) sound insulated safety care cab with environmental controls. All Cabs to be fitted with Air Conditioning. Air Pre-Cleaner to deal with dusty environment. Reversing Camera Amber warning beacon, audible reversing warning and standard reversing lights, red seat belts. Guarantee that plant supplied will be able to run on solid TY cushion tyres and without detriment to the plant or operator. Auto-lube on board dispenser for difficult to access greasing points, manual lubrication to ground standing operator greasing points. Automated engine cut off that shall activate with warning if plant is left in idle mode duration for longer than 3 minutes. Additional guarding around hydraulic hoses to minimise risk and wear and tear when in contact with waste. Reduced emissions (compliant with all current and planned legislation regarding emission control) - Euro 6 engines Fire Suppression System Plant Tracking System Load weighing systems to be installed on loading bucket to weigh material being loaded into hoppers or vehicles/containers. Hydraulic isolator switch to ensure complete shut down of plant in an emergency. Additional brush attachment option included required. 1 x Volvo L70 H Loading Bucket Tip of lip bucket 4.5m capacity with trash guard RUBBER BLADE 48" - Medium 911M 1" Lock Washers - Medium Blade (qty: 13) PLOUGH BOLT 1 x 4 (qty:13) PLOUGH NUT 1 " (qty: 13) Windscreen Cage Protection to fully protect the operator from debris falling from the bucket whilst maintaining maximum all round visibility. Roll Over Protective Structures (ROPS) & Falling Object Protective Structure (FOPS) sound insulated safety care cab with environmental controls. All Cabs to be fitted with Air Conditioning Air Pre-Cleaner to deal with dusty environment. Reversing Camera Amber warning beacon, audible reversing warning and standard reversing lights, red seat belts. Automated engine cut off that shall activate with warning if plant is left in idle mode duration for longer than 3 minutes. Additional guarding around hydraulic hoses to minimise risk and wear and tear when in contact with waste. Reduced emissions (compliant with all current and planned legislation regarding emission control) - Euro 6 engines Guarantee that plant supplied will be able to run on solid TY cushion tyres and without detriment to the plant or operator. Auto-lube on board dispenser for difficult to access greasing points, manual lubrication to ground standing operator greasing points. Fire Suppression System Plant Tracking System Load weighing systems to be installed on loading bucket to weigh material being loaded into hoppers or vehicles/containers. Hydraulic isolator switch to ensure complete shut down of plant in an emergency. 1 x JCB 3CX/JCB 4CX/JCB 5CX Amber warning beacon, audible reversing warning and standard reversing lights. Front mounted bucket - 1 piece 50mm wear edge Front solid tyres Fire Suppression System Plant Tracking System Windscreen Cage Protection to fully protect the operator from debris falling from the bucket whilst maintaining maximum all round visibility. Isolator or emergency stop switch to ensure complete shut down of plant in an emergency. Reduced emissions (compliant with all current and planned legislation regarding emission control) - Euro 6 engines Automated engine cut off that shall activate with warning if plant is left in idle mode duration for longer than 3 minutes. All Cabs to be fitted with Air Conditioning Air Pre-Cleaner to deal with dusty environment. Reversing Camera Additional guarding around hydraulic hoses to minimise risk and wear and tear when in contact with waste. All Cabs to be fitted with Air Conditioning. Rear Selector Grab Attachment required for sorting recyclable materials such as metal, wood, mattresses. The Collection Point/Affected Property/Treatment Site The Affected Property operates 7 x days a week. Operating hours are: Mon 07:00am-00:00 Tues-Sat 07:00am-23:30 Sunday 08:00am-17:00 Closed only Christmas Day & New Years Day Frequency of Collection/Service/Testing The Contractor shall provide a fully inclusive repairs and maintenance package within the base price to include collection charges and costs. The Contractor shall guarantee that in the event of plant and equipment failure not caused by the Operator or their agents or in excess of 24 hours, the Contractor shall undertake to supply an equivalent plant at their own cost. In the event that the Contractor is not able to supply a replacement within the agreed timeframe the Company may seek to replace with another hired plant. The contractor shall reimburse the Company the full cost of replacement and shall include any transportation costs incurred as a result of this. All plant and equipment shall hold a minimum of 12-month warranty. The Contractor is to ensure that in the event of any breakdowns (within the company's operating hours) a qualified engineer shall be sent out to site to rectify within 2 hours from notification, to investigate and or remedy the fault and or supply replacement plant. All parts failing due to general and expected wear and tear are to be replaced the Contractor at their cost. The Contractor will produce a list of parts and components which will fall within this category and are exempt within 1 month of the contract commencing. All servicing is to be carried out in accordance with manufacturer's guidance and to the manufacturer's minimum recommended specifications. Copies of all service records and annual inspections will be supplied to the company within 7 working days of all works being completed and retained by the Contractor for a period of 3 years from the expiry of agreement. Upon completion of any and all servicing, maintenance and or repair works the Contractors engineer must supply a signed handover document which states what work has been undertaken and that the plant is now safe, fit for use, fully serviceable and meets all Health & Safety requirements e.g. LOLER or PUWER certification has been issued. Costs for all part, labour and travel through wear and tear are to be included. Solid tyres are to be supplied to begin with as a one of and thereafter will be replaced/repaired by the Company.

Katy Reed

Published 6 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete