Millport Coastal Flood Protection Scheme - Construction

Complete

Value

£25,500,000

Classifications

  • Flood-prevention works
  • River regulation and flood control works
  • Flood-defences maintenance works
  • Coastal-defence works

Tags

  • tender

Submission Deadline

3 years ago

Published

3 years ago

Description

North Ayrshire Council requires the construction of offshore breakwater and onshore flood walls of the Millport Coastal Flood Protection Scheme.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Flood Cell 06, Snape Maltings

The Upper Alde & Ore Estuary Embankment Improvements scheme will reduce tidal flood riskand enhance the environment in the Upper Alde and Ore Estuary. The Alde and Ore Estuary is vulnerable to flooding from the sea made worse by the poor condition of many of the flood defences. The proposed Flood Cell 06, Snape Maltings scheme is 1 of 4 cells identified to improve the Standard of Service of the existing flood defences and provide resilience to withstand 300mm of overtopping from a 1:200+ year event, given predicted sea levels in 2050. The Client is theEast Suffolk Water Management Board. In summary, the scope of Works for the project includes civil engineering works (but is not limited to):  Establish main site offices, compound, temporary services and access routes.  Alliance House - Installation of approximately 20m of new demountable defences along the quay side with piled and concrete slab foundation;  River Alde Quay - Installation of approximately 120m of new demountable defences along the northern quay side with piled and concrete slab foundation;  Henry Moore Lawn - Improvement to approximately 80metres of earth flood embankment to be constructed in a passive fashion to provide improved flood protection and amenity and access value around the Henry Moore Lawn area terminating at the northeastern edge of the Concert Hall building; and  Terrace Car Park - Improvement to approximately 100metres of earth flood embankment, incorporating pedestrian access provision, constructed from the River Cafe terrace area, terminating into the southeast car park area. The works are estimated to cost around £2.3million. The form of contract will be a NEC4 ECC Option A. All tender documents are available through the Client or the Client's appointed tender and contract manager Stantec UK Ltd.

Katy Reed

Published 1 day ago
Open

Flood Cell 06, Snape Maltings

The Upper Alde & Ore Estuary Embankment Improvements scheme will reduce tidal flood riskand enhance the environment in the Upper Alde and Ore Estuary. The Alde and Ore Estuary is vulnerable to flooding from the sea made worse by the poor condition of many of the flood defences. The proposed Flood Cell 06, Snape Maltings scheme is 1 of 4 cells identified to improve the Standard of Service of the existing flood defences and provide resilience to withstand 300mm of overtopping from a 1:200+ year event, given predicted sea levels in 2050. The Client is theEast Suffolk Water Management Board. In summary, the scope of Works for the project includes civil engineering works (but is not limited to):  Establish main site offices, compound, temporary services and access routes.  Alliance House - Installation of approximately 20m of new demountable defences along the quay side with piled and concrete slab foundation;  River Alde Quay - Installation of approximately 120m of new demountable defences along the northern quay side with piled and concrete slab foundation;  Henry Moore Lawn - Improvement to approximately 80metres of earth flood embankment to be constructed in a passive fashion to provide improved flood protection and amenity and access value around the Henry Moore Lawn area terminating at the northeastern edge of the Concert Hall building; and  Terrace Car Park - Improvement to approximately 100metres of earth flood embankment, incorporating pedestrian access provision, constructed from the River Cafe terrace area, terminating into the southeast car park area. The works are estimated to cost around £2.3million. The form of contract will be a NEC4 ECC Option A. All tender documents are available through the Client or the Client's appointed tender and contract manager Stantec UK Ltd.

Katy Reed

Published 3 days ago
Open

Repairs and Maintenance DPS

This opportunity has been listed on behalf of LHC and our regional businesses: Consortium Procurement Construction (CPC) Midlands, London and South East (LHC) South-West Procurement Alliance (SWPA) This Dynamic Purchasing System (DPS) is designed to facilitate the procurement of repair, maintenance, and associated services across multiple disciplines, ensuring a structured and efficient response to urgent and planned works. This new DPS will be for the provision of repair and maintenance service for the public sector for use by: - Education - Healthcare - Emergency Services - Housing and residential - Public Sector buildings The DPS is divided into fourteen lots, split between four primary workstreams, each containing specific lots tailored to address key areas of building maintenance. Workstream 1 focuses on the building envelope and structural integrity, covering roofing repairs, external works, internal repairs including damp and mould, and the maintenance of windows, doors, and other openings. Workstream 2 addresses mechanical and electrical (M&E) systems, ensuring the operational efficiency of plumbing, heating and cooling, electrical systems, lifts, and detection systems such as CCTV and fire alarms. Workstream 3 provides environmental and infestation management, including property protection, pest control, and drainage solutions to maintain safety and hygiene. Workstream 4 encompasses multi-disciplinary services, allowing for an integrated approach to complex projects covering multiple areas within a single contract. To ensure adaptability, the DPS retains the flexibility to introduce additional lots in response to emerging industry requirements, as permitted under PCR 2015, provided that such modifications do not significantly alter the scope of the procurement. This ensures the DPS remains responsive to market developments, technological advancements, and regional needs, thereby offering contracting authorities a comprehensive and compliant procurement solution for a wide range of building maintenance and operational challenges.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete