Nottingham Community Housing Association Repairs Contract

Award

Value

£0

Suppliers

Classifications

  • Construction work
  • Building installation work
  • Electrical installation work
  • Mechanical installations
  • Building completion work
  • Plastering work
  • Joinery and carpentry installation work
  • Floor and wall covering work
  • Painting and glazing work
  • Other building completion work
  • Decoration work
  • Repair and maintenance services
  • Repair and maintenance services of building installations
  • Repair and maintenance services of electrical and mechanical building installations
  • Installation of fitted kitchens
  • Bathrooms construction work
  • Plumbing and sanitary works
  • Installation of doors and windows and related components
  • Call centre
  • Asbestos removal services
  • Roof repair and maintenance work
  • Cladding works

Tags

  • award
  • contract

Published

3 years ago

Description

Nottingham Community Housing Association ("NCHA") is seeking expressions of interest from suitably skilled and experienced suppliers for the delivery of responsive repairs works across its stock. The contract is being procured as 3 Lots; Lot 1 - North, Lot 2 - South and Lot 3 - North and South (Combination of Lots 1 & 2). Participants can apply for all or any of Lots 1 to 3, but as per the above, Participants should note that if Lot 3 is awarded, Lots 1 and 2 will not be awarded and if Lots 1 & 2 are awarded as separate contracts then Lot 3 will not be awarded.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Callington Skate Park

Construction Plan 1. Scope of Works. The works will include: • Site preparation and demolition of existing fence. • Earthworks, grading and sub-base preparation. • Installation of drainage systems. • Construction of reinforced concrete skatepark elements (bowls, ramps, platforms, coping). • Installation of street-style features (rails, ledges, stairs). • Perimeter works including pathways and landscaping. • Site clean-up, quality checks, and handover. 2. Methodology 2.1 Mobilisation • Establish site compound, temporary fencing and signage. • Set out works in accordance with approved design drawings. • Conduct pre-start meetings with subcontractors and suppliers. 2.2 Site Preparation • Clear vegetation, debris and unsuitable materials. • Carry out excavation to design levels. • Import and compact subgrade fill where required. 2.3 Drainage & Utilities • Install sub-surface drainage to prevent water pooling. • Connect to existing stormwater infrastructure. • Install conduits for future lighting and services. 2.4 Concrete Works • Coping and edging hot dipped galvanised. Cut ends to be treated with corrosion resistant paint system • Formwork, steel reinforcement and shotcrete application for bowls and ramps. • Machine finishing followed by hand-trowelling for smooth riding surfaces. • Expansion joints, coping stones and steel edges installed. 2.5 Ancillary Works • Install prefabricated hot dipped galvanised rails, ledges and modular features. • Construct pathways, seating areas and viewing zones. • Landscape the surrounding area. 3. Health, Safety & Environmental Management • Works to be carried out in accordance with [local construction safety legislation]. • Dust suppression and noise control measures. • Daily toolbox talks and risk assessments. • Waste management and recycling plan. • Public safety maintained through secure site fencing and restricted access. • Working hours 0800 to 1700. • All operatives working on site should have relevant CSCS cards.

Katy Reed

Published 1 hour ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline cancelled

Publish
Bid
Evaluate
Award
Complete