Roads and Transport Infrastructure Construction Framework

Planned

Value

£44,000,000

Classifications

  • Construction work for highways, roads
  • Construction work for elevated highways
  • Construction work for highways
  • Construction work for buildings relating to road transport
  • Car park building construction work
  • Bus-stop shelter construction work
  • Construction work for buildings relating to various means of transport
  • Bridge construction work
  • Road bridge construction work
  • Railway bridge construction work
  • Footbridge construction work
  • Construction work for iron bridges
  • Construction work for steel bridges
  • Bridge renewal construction work
  • Road tunnel construction work
  • Pedestrian tunnel construction work
  • Park-and-ride facility construction work
  • Drainage construction works
  • Drains construction work
  • Road construction works
  • Main road construction works
  • Ring road construction work
  • Secondary road construction work
  • Trunk road construction work
  • Road junction construction work
  • Grade-separated junction construction work
  • T-junction construction work
  • Roundabout construction work
  • Crossroad construction work
  • Overpass construction work
  • Footpath construction work
  • Cycle path construction work
  • Level crossing construction works
  • Road markings
  • Roadworks
  • Road-maintenance works
  • Road-repair works
  • Surface work for roads
  • Road-surface painting work
  • Repair, maintenance and associated services related to roads and other equipment
  • Construction, foundation and surface works for highways, roads
  • Paving slabs
  • Pedestrian ways construction work
  • Pedestrian overpass construction work
  • Pedestrian zone construction work
  • Surface work for footpaths
  • Foundation work for highways, roads, streets and footpaths
  • Foundation work for footpaths
  • Carriageway resurfacing works
  • Erection of road-barriers
  • Drainage works
  • Drainage and surface works
  • Street-lighting equipment
  • Street-lighting columns
  • Installation of road lighting equipment
  • Maintenance services of public-lighting installations and traffic lights
  • Street-lighting maintenance services
  • Core drilling
  • Core preparation and analysis services
  • Surveying instruments
  • Road paint

Tags

  • planning

Published

3 years ago

Description

Framework to provide contractors to carry out construction, repair and maintenance work to the City of Edinburgh's road network.

Similar Contracts

Open

DfI TRAM Road Asset Management - Surface Dressing Framework

This tender notice is for the award of a public contract through an open procedure in accordance with section 20(1) and (2)(a) of the PA 2023. The Department for Infrastructure – Transport and Road Asset Management (TRAM) intends to establish a multi-contractor, multi-lot framework, for the delivery of Surface Dressing. The Framework will include the following work activities: application of surface dressing, associated road markings, delivery of temporary traffic management as part of associated civils works on live trafficked public roads, and other associated ancillary works. The Framework will comprise of seven Area Lots (1-7). A Measured Term Contract (MTC) Call-Off will be awarded for each Area Lot as listed below. Each MTC will deliver surface dressing works commissioned through Works Orders, each with a value of up to £750k. Area Lots are: SDF S2 - Newry, Mourne and Down / Ards and North Down; SDF W2 - Derry and Strabane / Fermanagh and Omagh; SDF S1 - Armagh, Banbridge and Craigavon; SDF W1 - Mid Ulster; SDF N1 - Causeway Coast and Glens; SDF N2 - Mid and East Antrim / Antrim and Newtownabbey; SDF E1 - Belfast / Lisburn and Castlereagh. Framework award is expected to be in April 2026. However, works under the MTC Call-Off Contracts are not anticipated to commence until the 2027 Surface Dressing season, likely to commence in May 2027. This Framework will deliver works from Call-Off contracts with an overall cumulative value of £80m (ex VAT) over the four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the overall cumulative value to £100m (ex VAT).

Katy Reed

Published 5 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline planned