DfI Roads and Rivers T-1106 Term Contract for Street Lighting Maintenance and Improvement Works 2021

Complete

Value

£86,500,000

Classifications

  • Construction work
  • Works for complete or part construction and civil engineering work
  • Engineering works and construction works
  • Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
  • Electrical installation work

Tags

  • tender

Submission Deadline

3 years ago

Published

3 years ago

Description

The Term Contract for Street Lighting and Maintenance Works 2021 may include, but not be limited to, the following Principal Work Activities which are provided by way of example: A. Supply and construction of street lighting installations on an adopted public road B. Maintenance of all elements (columns, lanterns, cabling, control pillars) making up a street lighting network on an adopted public road. C. Periodic electrical inspection and testing on a street lighting network on an adopted public road D. Managing the delivery of street lighting works in accordance with the National Highway Sector Scheme for Scheme 8 E. Live working on a Distribution Network Operator’s (DNO) network. F. Delivery of Temporary Traffic Management (TTM) as part of associated civils works on live trafficked public roads in the following Local Government Districts: SLN2 - Mid and East Antrim / Antrim and Newtownabbey; SLE2 - Lisburn and Castlereagh; SLS2 - North Down and Ards / Newry, Mourne and Down; SLW2 - Derry and Strabane / Fermanagh and Omagh.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Refurbishment of St Christopher's Hall Dobbs Weir Road Hoddesdon EN11 0AZ

INVITATION TO TENDER Under the terms of the Audit Regulations and the Councils Standing Orders, the Council is required to seek 3 quotations. Tenders Are invited from suitably qualified and experienced providers to deliver the following works. Full details and plans are available on the Contracts Finder website Project Background St Christophers Hall was built by the villagers of Dobbs Weir in 1939. The nearest parish hall was in Roydon, which was a long walk for the Dobbs Weir Community, so they built the hall to allow fellowship and act as a meeting point for villagers. The villagers passed it over to the Diocese of Chelmsford for safekeeping and to look after which is how it remained for some 70 years. Around 15 years ago the Church decided that they wished to sell the land for development. The people of Dobbs Weir fought strongly against this and Roydon Parish stepped in to purchase the hall and the land for £50k using public funds. Unfortunately, since 2013, there has been no maintenance or development to the Hall and as a result the Hall is now in dire need of essential work to maintain its usage to meet safety requirements. The hall was built on a timber frame with a large main area, toilets, a small stage, and a kitchen area. It has outside space and parking facilities. The building hasn't altered in some 80 years and the general layout is still satisfactory, but the building is now in desperate need of refurbishment, to prevent it falling into disrepair and to bring it up to modern day safety standards. Project There are a number of elements to the renovation and once tenders are available, the Parish Council will decide if all or part of the project will go ahead. The elements are as follows: • Remove walls, roof and outer body of hall to strip back to wooden frame. Remove the low grade asbestos. Rebuild timber walls, renew tile roof, guttering, soffits, replace all windows and external doors with double glazed units. Insulate the whole building and partition the interior to form: kitchen, male & female toilets, disabled toilet with baby changing cubicle. Clad bottom half of exterior of building with wood effect low maintenance cladding. Remove current floor, insulate and renew subfloor. Renew electrics, renew plumbing and install electric heating and exterior lights. • Fit out interior, to include new kitchen, male, female and disabled toilets with hand basins, wc's, tiling, hand dryers, lay flooring in all rooms, install new lighting, door furniture, paint Accompanying documents Specification and drawings Building Regs approval Asbestos report Project costs The Parish Council will need detailed quotes to meet the objectives of Part 1 and Part 2 separately. The construction approach will need to be optimized to meet the project objectives, and the Council will be open to the possibility for some finishing items to be carried out by the community such as painting/kitchen fitting etc. The Parish Council does not have unlimited funds for this project, so it is important that quotes include a contingency. The Council have been advised that the full refurbishment cost will be in the region of 120k. Tender Submission Requirements The following should be submitted as part of this tender submission: • Full costing proposal - setting out quotes for each of the project elements, contingency and total cost (scoring percentage 50%) • Reasonable commuting distance to Dobbs Weir (scoring percentage 25%) • Document setting out experience in working on similar projects (scoring percentage 25%) to include: • Company structure, any subcontractors or other personnel who would work on the project • Company information, time in business etc • Evidence of delivering work on time and to budget • Reviews/testimonials from previous commercial clients • Location and photos of previous similar work carried out • Indication of timescale for each project element, indicating the total timescale for the whole project Important Information Works are ideally to commence in May 2025 and take no longer than 3 months. This is negotiable Tender Process All plans and documents can be viewed on Contracts Finder - GOV.UK (www.gov.uk) The site may be viewed via prior arrangement with the Parish Clerk Any points for clarification can be submitted to the Parish Clerk No contact is to be made with any Councillor during the tender period Tenders should be submitted no later than 20th May 2025 in a sealed envelope stating "Confidential Tender - St Christophers Hall" on the front to the address below or alternately submitted via the Contracts Finder website. Tenders should include a copy of your Public Liability Insurance, PPE Policy and evidence of any related accreditations. Please include any guarantees that will be given after work is completed and any after sales service included Bidders will be notified of the outcome by 9th June 2025. Health & Safety/Operation Staff employed to work on the contract must be fully trained, be aware of risks associated with working in the public domain and must adhere to codes of conduct and working practices. The Hall will be closed to the public during the works. Suitable hoarding will need to be used, and all waste removed from site using correct methods and licenses/permits

Katy Reed

Published 2 days ago
Open

Flood Cell 06, Snape Maltings

The Upper Alde & Ore Estuary Embankment Improvements scheme will reduce tidal flood riskand enhance the environment in the Upper Alde and Ore Estuary. The Alde and Ore Estuary is vulnerable to flooding from the sea made worse by the poor condition of many of the flood defences. The proposed Flood Cell 06, Snape Maltings scheme is 1 of 4 cells identified to improve the Standard of Service of the existing flood defences and provide resilience to withstand 300mm of overtopping from a 1:200+ year event, given predicted sea levels in 2050. The Client is theEast Suffolk Water Management Board. In summary, the scope of Works for the project includes civil engineering works (but is not limited to):  Establish main site offices, compound, temporary services and access routes.  Alliance House - Installation of approximately 20m of new demountable defences along the quay side with piled and concrete slab foundation;  River Alde Quay - Installation of approximately 120m of new demountable defences along the northern quay side with piled and concrete slab foundation;  Henry Moore Lawn - Improvement to approximately 80metres of earth flood embankment to be constructed in a passive fashion to provide improved flood protection and amenity and access value around the Henry Moore Lawn area terminating at the northeastern edge of the Concert Hall building; and  Terrace Car Park - Improvement to approximately 100metres of earth flood embankment, incorporating pedestrian access provision, constructed from the River Cafe terrace area, terminating into the southeast car park area. The works are estimated to cost around £2.3million. The form of contract will be a NEC4 ECC Option A. All tender documents are available through the Client or the Client's appointed tender and contract manager Stantec UK Ltd.

Katy Reed

Published 2 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete