DFI 3233014 – SHIMNA FLOOD ALLEVIATION SCHEME

Award

Value

£5,097,612

Suppliers

Classifications

  • Works for complete or part construction and civil engineering work
  • Construction work for water projects
  • Pile driving

Tags

  • award
  • contract

Published

2 years ago

Description

The project is for the provision of Shimna Flood Alleviation Scheme. The Economic Operator Team (EOT) will complete the construction of a fluvial flood defence in Newcastle, with an envisaged construction period of 12 months. The flood defence extends both upstream and downstream from New Bridge on the Bryansford Road and is approximately a total length of 1.45km comprising a combination of sheet pile flood walls (approx. 0.45km), secant pile flood walls (approx 0.89km) and piled earth embankments (approx. 0.11km). The EOT will be responsible for the final detailed design of the secant piles and sheet piles. Additionally, the works include the demolition of a number of property boundary walls and fences, the Relocation of a drainage ditch, construction of new pathways, wall cladding, a retaining wall, back drainage, landscaping, the erection of a flood gate and River works to MEMORANDUM OF INFORMATION PART B The EOT will also be responsible for Landowner and Stakeholder consultations ensuring necessary permissions, licences, permits, consents and approvals.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete