Provision of ESCo Services at Preston Barracks (Makerfield) Scheme, Brighton

Award

Buyers

Value

£2,514,540

Suppliers

Classifications

  • Energy and related services
  • Energy-management services
  • District heating

Tags

  • award
  • contract

Published

3 years ago

Description

Optivo is looking to appoint a Energy Service Company (ESCo) for the provision of ESCo Services to our Preston Barracks (Makerfield) Scheme in Brighton, which is currently under development.
Optivo’s residential parcel at Preston Barracks is made up of 369 homes and 87 commercial units.  A communal heating and associated Combined Heat and Power (CHP) plant will generate heating and hot water to all dwellings and to the 7 commercial units.
An ESCo provision is required to fully manage, maintain, operate, meter, bill, resident support, bad debt responsibility and plant replacement over a 25 year contract period.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

LOCAL AREA ENERGY PLAN FOR NORTH NORTHAMPTONSHIRE

The purpose of the commission is to advance the Net Zero goals and ambitions of North Northamptonshire. North Northamptonshire Council (NNC) are looking to appoint a suitably qualified consultant to produce a Local Area Energy Plan (LAEP) for North Northants. The LAEP will be an integral part of the Roadmap to Net Zero Action Plan and new Local Plan for the North Northants area. This energy strategy is critical as it will underpin the Council's climate emergency response and act as a framework to inform policy, planning, investment, and wider collaboration with key stakeholders to deliver Net Zero targets, including through the Big50 initiative. The LAEP should include a comprehensive emissions assessment of the built environment (all categories of domestic, non-domestic, commercial, and industrial buildings) and relevant aspects of the transport sector; science-based targets for emissions reduction, to include interim milestones and sector-specific targets. This includes both existing and planned development and other proposals. It will integrate insights from the North Northamptonshire to Net Zero (NN2NZ) project and the Local Plan evidence base and should be produced in conjunction with key stakeholders from the energy sector. NNC has procured baseline Net Zero data from the Energy System Catapult, the successful Supplier will be expected to use this data which pertains to stages 1-3 of the LAEP. Funding of up to £85,000 is available to support the creation of the LAEP, including stakeholder engagement. The contract will comprise an eight-month delivery programme.

Katy Reed

Published 2 days ago
Open

LOCAL AREA ENERGY PLAN FOR NORTH NORTHAMPTONSHIRE

The purpose of the commission is to advance the Net Zero goals and ambitions of North Northamptonshire. North Northamptonshire Council (NNC) are looking to appoint a suitably qualified consultant to produce a Local Area Energy Plan (LAEP) for North Northants. The LAEP will be an integral part of the Roadmap to Net Zero Action Plan and new Local Plan for the North Northants area. This energy strategy is critical as it will underpin the Council's climate emergency response and act as a framework to inform policy, planning, investment, and wider collaboration with key stakeholders to deliver Net Zero targets, including through the Big50 initiative. The LAEP should include a comprehensive emissions assessment of the built environment (all categories of domestic, non-domestic, commercial, and industrial buildings) and relevant aspects of the transport sector; science-based targets for emissions reduction, to include interim milestones and sector-specific targets. This includes both existing and planned development and other proposals. It will integrate insights from the North Northamptonshire to Net Zero (NN2NZ) project and the Local Plan evidence base and should be produced in conjunction with key stakeholders from the energy sector. NNC has procured baseline Net Zero data from the Energy System Catapult, the successful Supplier will be expected to use this data which pertains to stages 1-3 of the LAEP. Funding of up to £85,000 is available to support the creation of the LAEP, including stakeholder engagement. The contract will comprise an eight-month delivery programme.

Katy Reed

Published 5 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

[email protected]

+44 8001216060

+44 1274535518

[email protected]

+44 3450103503

Timeline complete

Publish
Bid
Evaluate
Award
Complete