Roads and Transport Infrastructure Construction Framework

Complete

Value

£101,760,000

Classifications

  • Construction work for highways, roads
  • Construction work for elevated highways
  • Construction work for highways
  • Construction work for buildings relating to road transport
  • Car park building construction work
  • Bus-stop shelter construction work
  • Construction work for buildings relating to various means of transport
  • Bridge construction work
  • Road bridge construction work
  • Railway bridge construction work
  • Footbridge construction work
  • Construction work for iron bridges
  • Construction work for steel bridges
  • Bridge renewal construction work
  • Road tunnel construction work
  • Pedestrian tunnel construction work
  • Park-and-ride facility construction work
  • Drainage construction works
  • Drains construction work
  • Road construction works
  • Main road construction works
  • Ring road construction work
  • Secondary road construction work
  • Trunk road construction work
  • Road junction construction work
  • Grade-separated junction construction work
  • T-junction construction work
  • Roundabout construction work
  • Crossroad construction work
  • Overpass construction work
  • Footpath construction work
  • Cycle path construction work
  • Level crossing construction works
  • Road markings
  • Roadworks
  • Road-maintenance works
  • Road-repair works
  • Surface work for roads
  • Road-surface painting work
  • Repair, maintenance and associated services related to roads and other equipment
  • Construction, foundation and surface works for highways, roads
  • Paving slabs
  • Pedestrian ways construction work
  • Pedestrian overpass construction work
  • Pedestrian zone construction work
  • Surface work for footpaths
  • Foundation work for highways, roads, streets and footpaths
  • Foundation work for footpaths
  • Carriageway resurfacing works
  • Erection of road-barriers
  • Drainage works
  • Drainage and surface works
  • Street-lighting equipment
  • Street-lighting columns
  • Installation of road lighting equipment
  • Maintenance services of public-lighting installations and traffic lights
  • Street-lighting maintenance services
  • Core drilling
  • Core preparation and analysis services
  • Surveying instruments
  • Road paint

Tags

  • tender

Submission Deadline

3 years ago

Published

3 years ago

Description

Framework to provide contractors to carry out construction, repair and maintenance work to the City of Edinburgh's road network.

Similar Contracts

Open

P1228 - Highways and Infrastructure Works Framework Agreement

Birmingham City Council is seeking to appoint organisations for the provision of Highways and Infrastructure Works via the Highways and Infrastructure Works Framework Agreement. These works will range from minor highway improvements, for examples new white lining, through various pedestrian and cycling improvements, to large scale infrastructure projects. The framework agreement will cover all works required to deliver highway and infrastructure projects for the Council. • Lot 1: works with an estimated value of up to £200,000. • Lot 2: works with an estimated value of between £200,001 and £1,000,000. • Lot 3: works with an estimated value of between £1,000,001 and £10,000,000. • Lot 4: works with an estimated value greater than £10,000,000. • Lot 5: contestable and non-contestable utility work related to capital infrastructure projects with no upper limit. The maximum number of tenderers awarded to each lot is as follows: • Lot 1: up to 10 • Lot 2: up to 6 • Lot 3: up to 3 • Lot 4: up to 2 • Lot 5: up to 3 Other local Public Bodies based within the East Midlands and West Midlands are entitled to use the Framework Agreement, subject to approval by the Council. This is affected by the completion of an access agreement between the Council and these other local Public Bodies. The open framework scheme will remain in place for a maximum period of up to eight years, commencing on the date that the Contract is awarded pursuant to this procurement process. Further details in respect of how the open framework scheme will operate are set out within the Framework Opening Protocol, contained in the tender documents. NEC4 terms and conditions will be used for this framework. Suppliers will need to ensure they are on the Central Digital Platform. Of the £980m framework spend (excl VAT), £640m of this is for Birmingham City Council

Katy Reed

Published 20 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete