Engineering Services for the Completion of Business Cases and Implementation of Mass Transit Project - Infrastructure

Award

Value

£0

Suppliers

Classifications

  • Engineering services

Tags

  • award
  • contract

Published

3 years ago

Description

South Yorkshire Passenger Transport Executive is seeking to appoint a suitably experienced provider of the above Services. The Services will include the following but are not limited to:
• A review of the existing body of work (supplemented by additional study of asset condition, where considered necessary)
• Production of designs, specifications and tender documentation
• Supply of engineering outputs and outcomes and programmes
• Forecast costs (Capital and Revenue) and design lives
• Management of tendering, construction and commissioning of infrastructure works
• More general advice on the development of the project as part of the overall Project Team.
Estimated value £7,500,000 subject to continuation of DfT funding and the option selected.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

5391 - Blackwood Comprehensive School – Ventilation Works

You are invited to submit a tender for the installation of ventilation units and boxing in of heating pipes. The scope of the project is fully described in Tender Documentation but in summary the scope is: - The contractor shall cost all necessary resources including weekend and overtime working to allow the project to be completed within the specified contract period. - The contractor shall be responsible for the removal and reinstatement of any loose and fixed furniture to allow the installation of all ventilation services and equipment as shown on the drawings. - Form new openings in the existing structure to allow the installation of the new external weather louvres - Carefully take down and reinstate any false ceilings to allow the installation of the new ventilation systems. Any damaged or stained ceiling tiles shall be replaced with new to match existing. - Install all of the new ventilation equipment and ductwork as shown on the tender drawings including all necessary wiring and controls. - Employ specialist commissioning engineers to set to work all new ventilation systems in accordance with the manufacturer’s requirements and demonstrate the correct operation of all systems to the satisfaction of the contract administrator. - Supply & install ventilation units, ducting and ancillary grilles/louvres, etc - Insulate & box-in exposed heating pipework - Electrical supplies to new equipment - Controls work & commissioning - Associated Builders Work - Provide O&M manuals and provide user training - The timescale for the work is 6 weeks from commencement of the contract. - Contractors shall note that the maximum time the school can be closed for is 6 weeks and if they cannot complete the work detailed in that time then they should not submit a tender proposal. - Works to be completed by 30th August 2025 - Contractors shall submit a detailed programme of works when submitting their costs for the project. The Contractors shall detail all key timings showing as a minimum, site setup, plant delivery, re-instatement works and commissioning and how this will be achieved in the contract period.

Katy Reed

Published 2 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete