NEC3 Clyde Bridge Replacement Project

Complete

Value

£6,000,000

Classifications

  • Construction work
  • Demolition work

Tags

  • tender

Submission Deadline

2 years ago

Published

2 years ago

Description

South Lanarkshire Council are proceeding with the construction of a 90-metre single span proprietary steel bridge to replace the existing reinforced concrete bridge structure, subject to the Council acquiring the land required for the project as set out below. The proposed structure includes a 4.2m wide carriageway with an additional footway of minimum width 1.05m. The new structure will be constructed off-line of the existing bridge. The proposed carriageway on approach to the structure will follow a new alignment and will include new approach roads to the north and south which will tie into the existing C29 Pettinain Road.
The proprietary bridge will be supported on reinforced concrete abutments which, in turn, will be supported by piled foundations. On the north approach the structure will also include wing walls which will not be connected to the abutment and will behave as retaining walls. On the south approach the structure will include wing walls which will not be connected to the abutment and will behave as retaining walls and a cattle creep structure.
The superstructure is proposed to be launched from the south abutment and a launching area for this purpose will be built.
In addition to this the design also includes for the replacement of a cattle creep structure located approximately 350m south of Clyde Bridge and the infilling of a culvert located approximately 270m south of Clyde Bridge.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete