TEO 2926458 Concept Design and Cost Input Framework to Outline Business Cases

Award

Value

£90,507

Classifications

  • Architectural design services
  • Civil engineering consultancy services

Tags

  • award
  • contract

Published

3 years ago

Description

This commission is for an Integrated Consultant Team (ICT) to provide concept design and cost input services to outline business cases. The services are to be provided in accordance with RIBA Plan of Work 2013, Stages 0-2 only, for a number of proposed Urban Villages Capital projects located in Belfast and Derry/Londonderry. The specific stage input is Stage 0 Strategic Definition, Stage 1 Preparation and Brief and Stage 2 Concept Design, for a number of Urban Villages Initiative projects including various community related building types, parks, public realm environmental schemes, vacant/derelict sites etc. Specific Employer Tasks are provided in the tender documentation Scope of Service Annex A – currently provided in draft for information purposes. The contract will operate for a period of two years with the option for the Employer to extend annually, subject to satisfactory ongoing performance, for a further two periods of one year each up to a maximum of four years.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

PSNI Property Management Services Contract 2026

The Contracting Authority intends to appoint a single Supplier for the provision of Property Management Services to support the Police Service of Northern Ireland (PSNI) maintain and develop its estate, executed under an NEC4 Framework Contract. The Supplier will be responsible for ensuring the estate remains safe, secure, compliant, and supporting estate modernisation and transformation in line with the PSNI Estate Strategy. Services must be delivered with the flexibility to meet urgent operational requirements, minimising disruption to core policing functions. This Framework Contract is designed to provide a compliant and flexible mechanism for the delivery of estate management services and project based works in alignment with PSNI’s strategic and operational needs. The Framework Contract is structured into two distinct service areas (Part A and Part B), with call-offs issued under the NEC4 suite of contracts. Part A Property Management Services: These services will be delivered under the NEC4 Professional Services Contract over a period of 4 years and 3 months. A break clause will be available at 3 years and 3 months, exercisable at the sole discretion of the Contracting Authority. Part B Project Delivery Services: These services will cover the delivery of projects including (but not limited to) demolition, upgrade, refurbishment, and new build works. Project requirements will vary in scale (Micro, Minor, and Major projects) with values ranging from £10,000 up to the applicable UK Public Procurement Threshold. Services may include project management and/or full Integrated Consultancy Team (ICT) services, depending on project complexity. These call-offs will be commissioned on an ad hoc basis and delivered under either the NEC4 Professional Services Contract (PSC) or the NEC4 Professional Services Short Contract (PSSC). The NEC4 Framework Contract will be established for a duration of 4 years from the Contract Start Date, with a discretionary break clause at the end of Year 3.

Katy Reed

Published 2 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

constructinfofinance-ni.gov.uk

[email protected]

+44 2890816555

[email protected]

+44 02879418866

Timeline complete

Publish
Bid
Evaluate
Award
Complete