Provide additional economic development capacity, expertise and knowledge support

Award

Value

£0

Classifications

  • Project management consultancy services
  • Architectural, engineering and planning services
  • Technical planning services
  • Urban planning and landscape architectural services
  • Urban planning services
  • Environmental planning
  • Construction project management services

Tags

  • award
  • contract

Published

2 years ago

Description

The Isle of Anglesey County Council (IACC) wish to procure a suitably qualified and experienced company to provide additional economic development capacity, expertise and knowledge to support the IACC (and its strategic partners). The fragile economy of Anglesey has also been impacted by the Covid-19 pandemic and support will be required during this period in order to assist in the recovery whilst also regenerating and transforming the local economy. As the recovery continues the IACC will need to capitalise upon future transformational opportunities such as the Shared Prosperity Fund, as well as projects and initiatives supported by the North Wales Growth Deal, in order to strengthen the development of Anglesey’s economy

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Project Management re. Brooksby Building BACS additional works

The contract is for a single supplier to provide Project Management in relation to the Project Management Brooksby Building BACS additional works Project at The Pirbright Institute, Ash Road, Pirbright, Surrey, GU24 0NF. The Brooksby Building at The Pirbright Institute (Pirbright) will be a high containment large animal facility for work on high consequence pathogens such as foot-and-mouth diseases virus (FMDV), when fully operational in 2026. As part of the post-construction 'Day 2' works there is a requirement to carry out additional works to the Building Automation and Control System (BACS) within the Brooksby Building to ensure it is fully aligned with the primary system used across the rest of the Pirbright site. The following packages of work have been funded and will be procured by Pirbright, with technical support from the Project Manager, and will require on-site project management to ensure all interdependencies, risks and issues are managed appropriately for the duration of the project: • Recategorisation of BACS alarms to align with Pirbright site standard and integration to Pirbright Alarm Management System (AMS) of all BACS alarms within Brooksby (Work Package 1) • Provision, installation, testing and commissioning of an additional 140 no. (approx.) BACS Input/Output Alarm Points (Work Package 2) The Scope of Services for this contract is as follows: - Full Project Management to include: - Management of programme for packages of work listed above - Management of sub-contractors, these will be appointed directly by The Pirbright Institute - Management of interdependencies - Principal point of contact for the project, liaising with internal and external stakeholders as required - Reporting: Production of Project Highlight Report on a monthly basis, on Pirbright template document - Responsible for ensuring project benefits are realised - Management of project budget - Responsible for monthly cashflow forecast reporting - Proactive management of project risks and issues, owner of Project Risk Register and Issues Register - Regular site attendance to ensure project is progressing as per programme - Quality Assurance - Site attendance at monthly Project Board meetings - Handover of all documentation in line with Pirbright Project Information File (PIF) structure. A Sample PIF is attached in Appendix E1B.

Open

Didcot Garden Town green infrastructure design including surveys to inform design, preparation of planning applications and drafting specifications for implementation

The aim is to obtain a proposal for the detailed design and specification of four blue-green infrastructure enhancement projects in areas of Didcot identified and analysed in the Green Infrastructure strategy (see Figure 1) through RIBA Stage 2-4. The proposal will include: • Principal Designer requirements under The Construction (Design and Management) Regulations 2015 • commissioning and carrying out of all surveys required to inform design and planning applications • engagement with relevant landowners (including the council) in liaison with the Didcot Garden Town team • preparation of drawings and documents, subject to council approval, required to secure planning permission with a focus on electronic versions rather than paper • preparation of specifications, including drawings and documents, to enable the council to procure contractors to implement the works on the ground. Project management of works on the ground, using the specifications prepared under this contract, is a future deliverable and will be procured separately by the council in due course. We are seeking a multi-disciplined team of consultants that cover a range of skill sets to enable the successful delivery of this commission, which may include the following: • Landscape architect / lead consultant (Principal Designer under CDM regs) • Quantity Surveyor • Planner • Ecologist • Hydrologist / drainage engineer

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

[email protected]

+44 1248750057

+44 2035971000

+44 2076315291

Timeline complete

Publish
Bid
Evaluate
Award
Complete