DfI Roads and Rivers T-1120 Interim Term Contracts for Asphalt Resurfacing Phase 2

Complete

Value

£40,700,000

Classifications

  • Construction work
  • Works for complete or part construction and civil engineering work
  • Engineering works and construction works
  • Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

Tags

  • tender

Submission Deadline

3 years ago

Published

3 years ago

Description

The Interim Term Contracts for Asphalt Resurfacing - Phase 2 will include the following work activities: delivery of multiple concurrent resurfacing schemes; laying various types of asphalt, asphalt concrete and thin surfacing; reshaping of carriageways; adjustment of street furniture to new levels; adjustment/provision of kerb lines; adjustment/provision of carriageway drainage systems; delivery of traffic management; provision of road markings and studs and other associated ancillary works in the following contract areas: IAS3 Armagh, IAW6 Derry, IAN1 Ballymena, IAE1 Belfast North, IAW5 Cookstown, IAN2 Larne and Carrickfergus

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Outdoor gym equipement

Invitation to Quote: Supply and Installation of Outdoor Fitness Equipment and Associated Works Overview The contracting authority is seeking quotations for the supply, delivery, installation, surfacing, and post-installation inspection of outdoor fitness equipment and associated infrastructure. Scope of Works The project includes (but is not limited to): Fitness Equipment Supply & Installation • Magnetic Bells Pro (1 unit) • Surface Challenge 3 (1 unit) • Balance Board (1 unit) • Double Stairs (1 unit) • Flex Wheel (1 unit) • Bike (1 unit) • Associated safety signage Surfacing & Groundworks • Site excavation and disposal • Supply and installation of MOT Type 1 stone base with geotextile membrane • Supply and installation of bonded rubber mulch safety surfacing (40mm depth, including trench edging) Preliminaries & Site Setup • Temporary fencing supply, erection, hire, and dismantling • Skip hire for mixed waste • Storage container hire • Welfare facilities (Hotwash unit) • Telehandler hire Inspection • Independent RPII post-installation safety inspection by a qualified inspector Deliverables • Fully installed outdoor fitness equipment • Safety-compliant surfacing and groundwork preparation • Independent inspection report Submission Requirements Interested suppliers must provide: • A detailed quotation including unit rates and total costs • Proposed timeline for delivery and installation • Evidence of relevant experience in similar projects • Proof of insurance and health & safety compliance Evaluation Criteria Submissions will be evaluated on the basis of: • Cost • Technical compliance with requirements • Delivery and installation timescales • Track record and references Deadline for Submissions Quotations must be submitted by 23rd September 2025 to [email protected].

Katy Reed

Published 43 minutes from now

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete