Appointment of Integrated Supply Team for St. Killian’s College, Carnlough, REF MA15-0000B404

Complete

Value

£28,800,000

Classifications

  • Building construction work
  • Construction work for buildings relating to education and research

Tags

  • tender

Submission Deadline

2 years ago

Published

2 years ago

Description

The Project is for the provision of the design, supply, delivery, receiving, off-loading, setting into position, fixing, erection, building testing, commissioning and finishing in every respect of the new St Killian’s College, Garron Tower, Carnlough. The new school buildings ,and works to Garron Tower associated external and site works are to be completed over a number of phases which will include the demolition of selected buildings. The new school complex will be a mixture of two and three storey blocks, including Garron Tower, with a gross internal floor area of 11182m2. The facilities will comprise: classroom teaching spaces for various subjects including but not limited to English, Maths, Languages, RE, Geography and History. Science, Technology, Art + Design, ICT, Music, Home Economics classrooms all with associated technician accommodation and storage rooms. Separate sports hall, gym hall and multipurpose hall with associated toilets, changing and shower accommodation for pupils and staff. The Scope will include full construction and selected demolition works, restoration works to Garron Tower, mechanical and electrical services, external and site development works.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Penrith Police Station Refurbishment 2025

The Penrith Police Station is an existing 3 storey building (located in the centre of Penrith) and will remain occupied in 24 hours operation for the duration of the works. The work will be carried out in phases including stand-down time between the phases to allow for decanting and re-occupation of completed areas. Externally: Formation of the Contractor's compound. For further details refer to the Access and Site Limitations drawing K1026-0-05 and Section 4.2 Significant Risks identified during Design. Any site accommodation located adjacent to surrounding buildings is to be 60 min fire resistant. Internally: The work content involves the refurbishment of individual rooms located on each floor level of the 3-storey building. Refer to Phasing Drawing K1026-0-04A. The refurbishment will involve stripping out all redundant fixtures, fittings and worktops, stripping out wallpaper and preparing finishes, replacement flooring, redecoration, replacement ceilings and LED lighting. The works (particularly to the services and drainage) may require penetration through existing fire-resistant construction and/or cavity barriers. The Contractor is required to have verifiable procedures in place for the making good, introduction of proprietary fire collars/sleeves etc. to maintain the integrity of the fire-resistant construction and/or cavity barriers. In addition to the installation of these services and drainage, a verifiable inspection and certification procedure for the integrity of the fire-resistant construction is required for submission at the completion of the Works.

Katy Reed

Published 3 days ago
Open

Penrith Police Station Refurbishment 2025

The Penrith Police Station is an existing 3 storey building (located in the centre of Penrith) and will remain occupied in 24 hours operation for the duration of the works. The work will be carried out in phases including stand-down time between the phases to allow for decanting and re-occupation of completed areas. Externally: Formation of the Contractor’s compound. For further details refer to the Access and Site Limitations drawing K1026-0-05 and Section 4.2 Significant Risks identified during Design. Any site accommodation located adjacent to surrounding buildings is to be 60 min fire resistant. Internally: The work content involves the refurbishment of individual rooms located on each floor level of the 3-storey building. Refer to Phasing Drawing K1026-0-04A. The refurbishment will involve stripping out all redundant fixtures, fittings and worktops, stripping out wallpaper and preparing finishes, replacement flooring, redecoration, replacement ceilings and LED lighting. The works (particularly to the services and drainage) may require penetration through existing fire-resistant construction and/or cavity barriers. The Contractor is required to have verifiable procedures in place for the making good, introduction of proprietary fire collars/sleeves etc. to maintain the integrity of the fire-resistant construction and/or cavity barriers. In addition to the installation of these services and drainage, a verifiable inspection and certification procedure for the integrity of the fire-resistant construction is required for submission at the completion of the Works.

Katy Reed

Published 3 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete