Provision for Fire Remedials and Fire Equipment Service and Maintenance

Award

Buyers

Value

£33,000,000

Classifications

  • Fire-prevention installation works
  • Miscellaneous fire-protection equipment
  • Fire-protection devices
  • Fire-alarm system installation work
  • Installation services of fire protection equipment
  • Smoke-extraction equipment
  • Fire-alarm systems
  • Fire-detection systems
  • Repair and maintenance services of firefighting equipment
  • Firefighting equipment installation work
  • CO2 fire-extinguishing equipment installation work

Tags

  • award
  • contract

Published

2 years ago

Description

One Housing Group invites expression of interest from suitably qualified and experienced organisations to deliver Fire Remedials & Fire Equipment Service and Maintenance.
The Contract is being tendered in two Lots:
Lot 1 - Fire Remedials
Lot 2 - Fire Equipment Service and Maintenance
Tenderers can submit a tender for Lot 1 and / or  Lot 2 but it is only possible for a tenderer to be awarded one.
One Housing Group is conducting this procurement through the open procedure of the Public Contracts Regulations 2015.  The contract will be for an initial term of 3 years subject to satisfactory performance by the service provider against agreed key performance indicators, with options to extend.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Plas Caerdeon Electrical re-wire works & fire alarm upgrade

The works comprise the electrical strip out and re-wire of Plas Caerdeon. It also includes the strip out and upgrade of the existing fire alarm system. It comprises of a Victorian manor house with communal GF areas including commercial kitchen as well as two upper floors which contain 15 dorm type bedrooms with separate shared bathroom facilities. There is also a separate converted stables and cottages which serve as self-catering accommodation for up to 17 people. The Project consists of the removal of the existing electrical wiring and outlets and replacing with new electric panel heaters and outlets/switches. The existing fire alarm system is to be striped out and replaced with a fully addressable system. It is the contractor's responsibility to design and specify the new fire alarm system and mange the works alongside the electrical installation. In association with these works there is a requirement to fill and make good all holes, penetrations etc. left by the removal of the old equipment, and also to the new equipment and cables provided by the new installation, paying particular attention to the Fire Strategy of the building and providing fire stopping where required, by a third-party accredited fire stopping contractor. In full compliance with the buildings fire strategy. As these works require decoration & making good, the University have requested that the decoration of all affected areas is included within the programme of works. In association with providing the new electrical panel heaters, socket outlets and switches to the building the following electrical works will also be required to facilitate the new installation.

Katy Reed

Published 4 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Rosella Ngeh

[email protected]

+44 2088214708

[email protected]

+44 1142203655

[email protected]

+44 2085598686

Timeline complete

Publish
Bid
Evaluate
Award
Complete