SDF Lot 7 South West_ Enerveo Limited B

Award

Value

£1,622,746

Suppliers

Classifications

  • Construction work
  • Electrical machinery, apparatus, equipment and consumables; lighting
  • Lighting equipment and electric lamps
  • Illuminated signs and nameplates
  • Parts of lamps and lighting equipment
  • Street-lighting equipment
  • Street-lighting columns
  • Signs and illuminated signs
  • Illuminated traffic signs
  • Tunnel lighting
  • Construction work for buildings relating to road transport
  • Construction work for highways, roads
  • Road construction works
  • Main road construction works
  • Road-maintenance works
  • Traffic-calming works
  • Electrical installation work
  • Installation of road lighting equipment
  • Installation of illuminated road signs
  • Repair and maintenance services
  • Repair, maintenance and associated services related to aircraft, railways, roads and marine equipment
  • Repair, maintenance and associated services related to roads and other equipment
  • Maintenance services of public-lighting installations and traffic lights
  • Street-lighting maintenance services
  • Commissioning of public lighting installations

Tags

  • award
  • contract

Published

2 years ago

Description

National Highways continues to roll out the Asset Delivery model to its operational areas. There is a
requirement to deliver a range of renewal, improvement and selected small scheme construction works on the
Strategic Road Network in areas utilising specialist contractors working collaboratively with National Highways
to deliver these works. It is envisaged that this framework will straddle two Road Investment Strategy (RIS)
periods (RIS 2 and RIS 3) enabling a smooth transition between them. Works for schemes have been divided
into a number of workstreams that align with the contractors' specialisms, and will also include design.
Bandings have been introduced into the framework model to differentiate some contracting terms between
bands.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Tender for the design, supply and installation of new skatepark equipment within Swanage skatepark/wheeled sports area

Swanage Town Council seeks submissions for the design, supply and installation of new skatepark ramps and rideable features that are suited to a full range of users from beginners to advanced. This will accompany existing equipment and will form phase one of a two or three-phase project to enhance the wheeled sports park. It is necessary that the new equipment successfully functions alone, in conjunction with the existing ramps and a complete future build. To achieve this it is expected the build will be modular in form and use the same materials as the existing ramps (skatelite and steel frames with open sides). It is essential that a high-quality wheeled sports park is delivered that will have a feeling of flow; fun, stimulation, challenge and excitement for users. A mix of rideable features that accommodate all ages, abilities, and wheeled sports is anticipated. Meeting the needs of the multi-generational users of Swanage Skatepark, particularly the local young people is a fundamental requirement. Swanage Town Council is working in partnership with Swanage Skatepark Community Project (SSCP), a group of skatepark users who formed a registered charity under the umbrella of Swanage and Purbeck Development Trust in December 2023. Extensive community engagement has already been undertaken by SSCP and the successful contractor will be responsible for presenting their design to the local community including SSCP and then finalising the design and safely delivering the construction, installation and handover stages of the project. It is a requirement that the new equipment is installed and opened for use by the public in autumn of 2025. Given the location of the facility and the nature of Swanage as a tourist destination, on site works will not be permitted in the main summer season of July and August. Conditions of participation relating to suppliers legal and financial capacity and technical ability to perform the contract are detailed within the tender documents.

Katy Reed

Published 6 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete