Main Contractor to Design Supply and Install Car Park Access Control and Revenue System

Award

Value

£128,395

Suppliers

Classifications

  • Car park building construction work
  • Primary works for services

Tags

  • award
  • contract

Published

3 years ago

Description

Strathclyde Partnership for Transport (SPT) are seeking Main Contractor to design (if required), supply and install a new car park access control and revenue collection system at three Glasgow Subway park and ride site

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Northwest Contractor Framework

Wirral Borough Council (the "Council") as the Contracting Authority in partnership with Procure Partnerships intends to let a Closed North West Contractor Framework (the "Framework"). The Framework will have a maximum duration of four years and may be used to award contracts for the Council's pipeline of works and will be accessible by North West Public Sector Bodies / Contracting Authorities. The Framework consists of Thirteen Lots broadly categorised as Construction Lots (Lots 1-6) / Infrastructure Lots (Lots 7-12) / Demolition Lot (Lot 13). The Council aims to appoint Ten Contractors to each Framework Lot, except for Lot 13 Demolition which will have one single contractor. Lots 1 - 12 will be accessible by Public Sector Bodies / Contracting Authorities in the North West Region UKD). Lot 13 will be accessible by Public Sector Bodies / Contracting Authorities in the Merseyside Region UKD7 only. Where there are ten suitable applicants, the highest scoring ten Contractors for each Lot will be awarded a place on that Framework Lot, and will be ranked from one to ten: the highest scoring Contractor becoming the Rank 1 Contractor, the second highest becoming the Rank 2 Contractor etc. Should a Contractor decline to accept their offered place on the Framework, then a place may be offered to the next highest scoring Contractor (i.e., who may have come eleventh). The Council will also offer one reserve place to Lot 13 Demolition. The Reserve Contractor will be the Tenderer which ranked second. The Reserve Contractor may be brought on to the Framework at any stage during its term where the Council permanently excludes or terminates the Framework Agreement with a Contractor (having won a place on the Framework) for poor performance or otherwise (e.g., insolvency) as provided for in the Framework Agreement. The Reserve Contractor may be brought onto the Framework if the Rank 1 Contractor declines an opportunity from an End User for any reason. As such, the Reserve Contractor will to be required to sign a variation of the Framework Agreement at the point in time that they are invited onto the Framework. The intended number of ten Contractors per Lot may be varied: The maximum number of Contractors awarded a place on each Lot may increase only where two or more suppliers have tied scores, and are jointly placed in the last position (tenth) in respect of each Lot. In such a case, the Contractors who are tied with the same score in the last position for each Lot shall be deemed to be one Contractor for the purpose of calculating the maximum number of Contractors for each Lot. The Council will award a Framework Agreement to additional Contractors where their final score is within 0.01 - 1.00% of the awarded last place position only. For the avoidance of doubt, last position for each lot is tenth position. Only one contractor will be awarded a place on Lot 13 Demolition. One reserve place will be allocated to Lot 13. Where two or more Contractors have tied scores and are in any position except for the last (tenth) position for each Lot, the number of Contractors will fill the positions immediately following the position that they have tied for. For example, where two Contractors are tied in the sixth position, they will occupy the sixth and seventh positions. For example; where three Contractors are tied in the sixth position, they will occupy that sixth position as well as the seventh and eighth position respectively for the purpose of calculating the maximum number of Contractors in respect of the Lot in question. If less than ten Contractors meet the selection criteria to get on each Framework Lot, the Council reserves the right to proceed to establish the Framework with less than ten Contractors on each Lot or to cancel the procurement of that Lot. Further where a Contractor's total score (based on the technical and commercial award criteria) for a Lot ranks them within the top ten Contractors but is under 50%, then on the basis that the Council does not wish to compromise on the calibre of appointed Contractors, the Council reserves the right not to offer them a place on the Framework, and to proceed to award that Lot to less than ten Contractors.

Katy Reed

Published 4 hours ago
Open

Concession Contract for the Provision of Electric Vehicle Charging Points 2026 - 2041

Hampshire County Council (The Authority) is procuring a Concession Contract for the provision of Electric Vehicle Charging Points along with the associated infrastructure and software to help deliver local, on-street Electric Vehicle (EV) charging infrastructure. This will be primarily for low (less than 22kw) power charger points to aid the transition to EV's and shift away from traditional petrol / diesel powered cars. The project is predominately aimed at supporting residents without off-street parking (i.e. driveways) by reducing the barriers of entry for EV take up. To assist with the roll out of this project nationally, central government has allocated grant funding through the Local Electric Vehicle Infrastructure (LEVI) fund. The Office for Zero Emission Vehicles (OZEV), Energy Saving Trust (EST), The National EV Insights and Support Service (NEVIS) and PA Consulting are all involved with administering the fund. The Authority has secured grant funding of £6.662 million from LEVI. Further details can be found here: On-Street Residential Chargepoint Scheme guidance for local authorities - GOV.UK (www.gov.uk). The grant funding will exclusively be allocated towards Standard [up to 7.9kW] EVCP and Fast [8kW to 22kW] Electric Vehicle Chargepoints (EVCP). The Authority has been set a target by central government to provide a range of on-street charging points by 2040. The figures below have been set by The National EV Insights and Support (NEVIS). The projected volumes for Hampshire are: • 15,414 standard charge points [up to 7.9kW] • 1016 fast charge points [8kW to 49.9kW] • 848 rapid / ultra-rapid charge points [50kW and above] Outside of the LEVI subsidy the Electric Vehicle Charging Infrastructure may be delivered in a variety of ways either through on-street provision or for example via ‘hubs’ within designated areas which may be existing car-parks / park and ride, or other sites as identified by the Authority. The contract may also include the requirement and cover, for example, delivery of Mobility Hubs or Section 106 agreements. Estimated Deployment Numbers & Contract Value It is anticipated that potential revenue generated over the lifetime of this agreement could be significantly impacted by the overall number of chargepoints installed and speed at which the Deployment Plan is rolled out. For the purposes of this procurement, the value of this concession contract has been estimated and advertised as having an maximum revenue income of up to £4bn. This value as been estimated based on a target of 17,278 Electric Vehicle Chare Points (EVCP) being delivered within the first 5 years of the contract commencement, at 50% of total possible energy consumption available 24-hours a day and 365 days per year, at the maximum allowable tariffs rates adjusted for Consumer Price Index (CPI) increases on an annual basis. The figures used for the basis of this estimate are available in Section 19 of Appendix 1 Technical Specification. Please note, the contract value is an estimation and is no guarantee of revenue levels. Suppliers need to be aware the contract value will potentially be impacted over time by several external factors outside of the Authority’s control which may further increase or decrease the contract value over its 16-year period (15+1). These factors may include but are not limited to: • The take up of electric vehicles and their market price impacting future customer demand • On-street charge point usage • Developments in charge point technology • Developments in electric vehicle and battery technology • ChargePoint downtime for repairs and maintenance • Developments in customer charging arrangements (e.g. the ability to charge customers via their domestic supplier billing arrangements) • Future additional Government investment in Electric Vehicle markets and infrastructure • Electricity price changes over time (we have attempted to account for these in our modelling) • Local Government Reorganisation and potential future changes in Local Authority areas. Any changes required to the contract, including value, will be managed via a contract change/modification process and supported by the appropriate statutory notices.

Katy Reed

Published 1 week ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete