CEFAS22-25 OWEC Poseidon (Lot 1 - North Sea, Lot 2 - Irish Sea) RE-RELEASE

Award

Buyers

Value

£673,318

Classifications

  • Research vessel services
  • Survey vessels

Tags

  • award
  • contract

Published

3 years ago

Description

POSEIDON (Planning Offshore Wind Strategic Environmental Impact DecisiONs) is a Crown Estate-funded project (Offshore Wind Evidence & Change program (OWEC)) led by Natural England. The aim of the project is to provide tools to inform offshore wind planning, to minimise impacts on the natural environment through avoidance and early awareness of likely mitigation / compensation needs, allowing sustainable expansion of offshore wind. This will be achieved through the collection of strategic environmental baseline data and updated spatial models for key species (receptors), assemblages, and a suite of ecological metrics (diversity, functional traits). These will be used to identify regions that are most vulnerable to offshore wind impact and mapping of the environmental risk to help guide future offshore wind development rounds and to feed into wider marine planning.
This procurement is sub-divided into 2 Lots as set out in the Specification of Requirements. Tenderers must make clear which Lot they are bidding for. Each Lot will be evaluated separately.
https://defra.bravosolution.co.uk/go/854493290180FAC44266

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

CEFAS25-80 ITT for bathymetric surveys at Sizewell C for the BEEMS programme

The BEEMS (British Energy Estuarine and Marine Studies) programme is funded by Sizewell C Limited. Through this programme, Cefas provide authoritative scientific information on the marine and transitional waters in the vicinity of potential new build nuclear power stations and require the Supplier to deliver the elements described below.  The purpose of this project is to provide bathymetric data at Sizewell to assess the geomorphological changes of the region, hence contributing to the ongoing monitoring of the Sizewell Coastline. These surveys are a regulatory requirement under the Development Consent Order’s (DCO) conditions and the Coastal Processes Monitoring and Mitigation Plan (CPMMP). Cefas anticipate 4 - 6 Multibeam Echosounder (MBES) bathymetric surveys to IHO Special Order (at a minimum) within the Greater Sizewell Bay (GSB) for a 12-month period between October 2025 and September 2026 (with the option to extend for up to 4 additional years), roughly following a quarterly schedule with the potential for additional surveys subject to requirements. Exact survey dates will be agreed between Cefas and the supplier during the pre-survey kick off meetings, however the timings for surveys are dependent on construction schedules so may be subject to change at short notice. We currently expect the first survey to be required in October/November 2025, with following surveys in approximately January 2026, April 2026 and July 2026. A Core Contract will be awarded to the top ranked Supplier and up to 3 Call-Off Contracts will be awarded to the next 3 ranked Suppliers. Full details are in the Bidder Pack, available from the eProcurement system once Suppliers have registered their interest.

Katy Reed

Published 3 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete