YORbuild3 Minor Works Contractors Framework Agreement North East Area

Award

Description

A Framework Agreement to serve all public sector bodies (and their statutory successors) and third sector organisations in the North East Yorkshire (UKE2) as detailed in the procurement documents.
Following the consultation on local government reorganisation in North Yorkshire, it was announced in July 2021 that the current county, district and borough councils would be replaced by a new single council for North Yorkshire with City of York Council remaining as it is.
Scarborough Borough Council is currently named as the contracting authority for the YORbuild3 North West area frameworks.
The new council is expected to officially start in April 2023. Until then, Scarborough Borough Council will continue as the contracting authority for this framework.
Once the new authority officially comes into being then the framework contracting authority for the North East areas will automatically transfer to the new North Yorkshire Council
The works involved are principally general building works and new housing, including contractors design when required. In addition some civil engineering works may also be included. The full list of accessing bodies is detailed within VI.3.
Principles of collaborative working and partnering will be key to the relationships under the framework.

Similar Contracts

Open

Ardersier Port, Phase 2 - Quay Civils (300m)

Quayside Civils (These works are the focus of this PQQ) - Setting up principal contractor welfare area including all temporary service connections, - Breaking out and disposal of concrete guide walls following installation by quay wall contractor, - Removal of piling mat, installed by Others, - Cropping of diaphragm wall to cut off level. - Reinforced concrete capping beams, to both quay and anchor wall, with a design life of 100 years to tie in with the Phase 1 quay, Including the supply and installation of all quay furniture cast in elements. - Removal of existing sheet pile quay wall, anchor wall and tie rods. - Excavation to tie rod level, approximately +0.0mCD, including dewatering system to facilitate, - Installation of tie rods (free-issue) between quay and anchor walls, - Backfilling above tie rods to formation level using site-won material, - 100m wide quay apron along the entire length of the new quay including capping layer and unbound stone pavement, - 250kPa uniform loading capacity, - Finished level of +6.5mCD (varies depending on drainage falls), - Installation of temporary and permanents sheet piles, - Infiltration drainage system with trenches as required, - Quay furniture including flexible mooring and berthing equipment such as pneumatic fenders, removeable bollards, and safety equipment inclusive of all associated cast in items, - Instrumentation and monitoring equipment associated with the quay wall. - Upgrades to the existing quayside which extends east beyond the new Phase 2 300m diaphragm wall and apron by approximately 758m, whilst retaining the existing quay wall, to extend the usable quayside (dredged by others). There will be a requirement for the Contractor to coordinate elements of works with the Clients quay wall and landside civils principal contractors. There is potential for the works to be varied to extend the new quay wall and quay wall civils further than the initial 300m.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete