Molten Salt Test Bed Build

Award

Value

£417,000

Suppliers

Classifications

  • Machines and apparatus for testing and measuring

Tags

  • award
  • contract

Published

2 years ago

Description

The University of Leeds intends to enter into a contract with Copenhagen Atomics for the manufacture and supply of a Molten Salt Test Bed

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Propellor Thrust Experiment Equipment

The University has a requirement for the purchase of equipment for measuring thrust output of drone or RC plane motors and propellors, and equipment for measuring thrust and balance across multi motor aircraft, as per the following technical requirements: Equipment for measuring thrust output of drone or RC plane motors and propellors; • The equipment needs to allow the universal mounting of different drone motors. • Measure at least 5 kgf of thrust and 2 Nm of torque. • A clear digital display of the following parameters (display can be either built in or utilise a PC or laptop and software) o Thrust o Torque o RPM o Derived motor efficiency • It should be possible to store and export data. • The equipment should be able to operate both manually as well as run automated tests such as a step or ramp test. Equipment for measuring thrust and balance across multi motor aircraft; • The equipment needs to allow the universal mounting of different drone motors. With a minimum of 4 motors to be tested simultaneously. • It must be possible to mount the motors in different configurations simulating different layouts seen in aircraft. • Measure at least 10 kgf of thrust and 6 Nm of torque. • A clear digital display of the following parameters (display can be either built in or utilise a PC or laptop and software) o Thrust o Torque o RPM o Derived motor efficiency • It should be possible to store and export data. • The equipment should be able to operate both manually as well as run automated tests such as a step or ramp test.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete