Eastleigh Post Office Project

Award

Value

£7,499,043

Classifications

  • Works for complete or part construction and civil engineering work

Tags

  • award
  • contract

Published

2 years ago

Description

Eastleigh Borough Council (EBC) has acquired the former Eastleigh Post Office site and has secured planning permission for the demolition and redevelopment of the site. The works involve:
Principal Contractor (CDM 2015);
Design development and full design responsibility including Principal Designer (CDM 2015) and discharge of all planning conditions;
Site establishment, securing of boundaries and maintaining safe pedestrian and vehicular access;
Isolate and terminate all existing utility supplies and provision of new supplies for the development;
Removal of all residual rubbish, fly tipping etc both internally and externally;
R&D asbestos survey of the Sorting Office section of the building;
Removal and clearance of all asbestos containing materials;
Demolition of existing buildings, removal of hardstanding and excavation to required levels;
Construction of foundations and service routes;
Construction of the two new buildings including:
Front Block - 1 Nr Commercial unit on the ground floor, 10 residential units to the upper three floors, Residential bin and bike stores;
Rear Block - 1 Nr Commercial unit on the ground floor, 18 residential units to the upper five floors, Residential bin and bike stores;
Separate commercial bin and bike store;
All mechanical and electrical installations within the building;
Construction of the Public Realm comprising hard and soft landscaping building;
Alterations to all below ground drainage and connections.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Bass Rock Refurbishment 2025 - 2027

We have a provision of refurbishment of Bass rock lighthouse. This lighthouse is situated on a steep crag on the southern entrance to the Firth of Forth off the east coast of Scotland. The island rises out of the sea to a height of 107 metres and it is about a mile in circumference. It is an important nesting ground for seabirds, including 40,000 gannets. The island is accessed from North Berwick by boat with a concrete path leading from the steps at the boat landings up to the lighthouse through the ruins of the Castle walls. We require a competent contractor to carry out the scope of works as below, these are initial requirements and they may be added to in the tender documents. Lighthouse Tower refurbishment - Painting, internal and external – full building externally, decoration internally Glazing repairs – replacing window panes in light room Electrical upgrades – installation of new light, batteries and solar array Installation of HCL on roof dome Safety gates installed Asbestos testing Free issue equipment and detailed scope will be confirmed in the tender documents. External refurbishment Winch house at side of lighthouse tower to be removed, asbestos present in the roof Drainage – courtyard drainage repairs Wall removal Minor repairs to access landing and steps Bird guano removal Full details of the works will be given in the Tender documents. Contractors will need to confirm their competence in working at height, electrical works, and health and safety and environmental management. Due to nature Scotland restrictions in relation to bird nesting, access to Bass Rock for the works can only be between October and January every year. We expect these works to be carried out between these months in both 2025/26 and 2026/27. Access day to day will be by boat from the mainland, to be arranged by the awarded contractor. There are no toilets, overnight or fresh running water facilities on this site. Due to these limited welfare facilities and the PPE required to work on site, the works need to be carried out on site to a maximum of 4 hours per day. We will require all interested contractors to attend a mandatory site visit on 16th July 2025. We expect the following PPE to be supplied by NLB for this site visit – boat suits, breathing apparatus, lifejackets, personal locator beacons (PLB), Manta helmets. Interested suppliers are to wear waterproof footwear and clothing. Timeline Set out below is the proposed procurement timetable. This is intended as a guide and, whilst the NLB does not intend to depart from the timetable, it reserves the right to do so at any time. Issue of Invitation to Tender - 3rd July 2025 Site Visit - 16th July 2025 Clarification deadline - 24th July 2025 Tender return deadline - 6th August 2025 Tender Award - Estimated by mid-end August 2025 Tools and materials to Oban - By 10th October 2025 Contract start - 21st October 2025 To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=963528697

Katy Reed

Published 11 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Mr Dominic Mackrill

[email protected]

+44 7795496474

Timeline complete

Publish
Bid
Evaluate
Award
Complete