Rules of the Road Ground Truth Surveys Framework

Award

Value

£4,000,000

Suppliers

Classifications

  • Surveying services

Tags

  • award
  • contract

Published

3 years ago

Description

Transport for West Midlands (TfWM), on behalf of the West Midlands Combined Authority (WMCA), are looking to provide a region wide “System” for the recording and upkeep of regulatory, order and non-order based highway data, mapped to provide information in a digitised format. This Traffic Order Management system (System) will operate across the entire region but will encompass individual access for each of the seven (7) constituent local highway authorities (LHA), being Birmingham, Coventry, Dudley, Sandwell, Solihull, Walsall and Wolverhampton who will have individual control of the traffic orders within their boundaries.
One of the critical aspects of this project is establishing the existing restrictions, prohibitions, and regulatory markings in each of the LHA areas. It is envisaged that best way of achieving this will be from detailed Ground Truth Surveys (GTS) of the highway in each LHA area. These surveys will then form the basis for the review of the on street signing and lining compared to the existing Traffic Regulation Orders which may ultimately result in new consolidation orders being produced in some or all of the LHA areas. 
At present there is only a budget available for £500k for surveys to be carried out in the 2022/23 financial year. It is likely, although not confirmed, that further surveys will be required over the next four years which shall be carried out under this Framework.

Similar Contracts

Open

PRO004895 Flow and Asset Management Surveys including Wastewater Surveys

United Utilities is looking to re-procure its current framework for Flow and Asset Management Surveys. The framework will constitute 2 Lots: Lot 1 - Wastewater Network Asset Surveys Lot 2 - Flow & Water Quality Surveys Services required under the Lots are as follows: Lot 1: a) Manhole Surveys b) Pumping Station Surveys c) Combined Sewer Overflow ("CSO") Surveys d) Impermeability Surveys e) Drainage Connectivity Surveys Lot 2 services will be required in river, in sewer and in waste water treatment works (WwTW) as follows: a) installing sewer depth and flow monitors, b) river depth monitors, c) river stage boards, d) rain gauges, e) portable wastewater samplers, f) dissolved oxygen/temperature monitors, g) monitoring the equipment either continuously or for wet weather and dry weather events. h) all telemetry raw data, with the exception of rain gauges to be capable of being viewed live via a website and downloaded by the Procurer at all times. i) collection and processing of data in accordance with the requirements of the Call-Off Particulars of the required Survey, and j) production of reports in accordance with the requirements of the Call-Off Particulars of the required Survey. Surveys in a river may include Time of Travel Surveys and river flow gaugings together with continuous monitoring for the following: a) Time of travel surveys b) River flow gauging c) Continuous monitoring of: i) dissolved oxygen (mg/l) ii) dissolved oxygen (% Saturation) iii) temperature iv) phosphorus v) phosphate vi) pH monitoring vii) turbidity viii) chlorophyll ix) conductivity x) ammonium Surveys in WwTW will comprise a combination of flow and quality monitoring. Surveys may be for flow alone or for flow and quality monitoring combined. Surveys may be for sewer, river or treatment works in isolation or in combination The services required are to be provided in Cheshire, Merseyside, Manchester, Lancashire and Cumbria.

Katy Reed

Published 2 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete