Framework Agreement for General Civil Engineering Works

Award

Value

£0

Classifications

  • Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
  • Environmental improvement works
  • Miscellaneous furnishing
  • Highway operation services
  • Traffic-calming works
  • Construction work for highways, roads
  • Highway maintenance work
  • Painting work of structures
  • Drainage works
  • Carriageway resurfacing works
  • Resurfacing works

Tags

  • award
  • contract

Published

2 years ago

Description

To supply work's in relation to works on the highway including footway resurfacing, drainage and structural works.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Energy Efficient Retrofit Installers (CPU 7720)

Nottingham City Council, as the accountable body for the Midlands Net Zero Hub, is inviting applications from suitably experienced and qualified entities to participate in a DPS covering the design, supply, and installation, of a number of categories of energy-efficient equipment and solutions to domestic premises. This DPS is organised into 7 Categories covering the types of measures and installations required: • Category 1: Solid Wall Insulation (external &/or internal) • Category 2: Park Homes Insulation • Category 3: Multiple Insulation Measures (combinations of CWI, SWI (Int or Ext), FI, RIR, LI, Ventilation, Glazing, Doors) • Category 4: MCS measures and Integrated Systems (Solar PV, battery storage, heat pump (AHSP / GSHP etc), Solar Thermal, Ventilation) • Category 5: Shared systems (communal heating, shared solar and ground heat loops) • Category 6: Low-Cost Measures (Low energy lightbulbs, Hot water tank insulation jacket, Draughtproofing and Heating controls / Smart Heating Controls) • Category 7: Whole House Retrofit Solutions (combinations of any measures) In addition, call-offs may include associated works and services either where these are necessary to undertake the works that are central to the call-off (e.g. installing scaffolding for working at heights), or where it would be beneficial to the project to have additional works or services carried out by the same contractor and the associated works or services constitute a small part of the overall call-off. Please note, this advert covers the entire estimated lifespan of the DPS. Applications submitted within the first 30 days will be assessed before any tender opportunities are published through the DPS. Applications received after the first 30 days will be assessed thereafter on an ongoing basis.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete