Services-Framework- Lot 1 Repair of Motors & Lot 2 Repair of Variable Speed Drives

Award

Value

£0

Classifications

  • Repair and maintenance services of electric motors
  • Repair and maintenance services of electrical machinery, apparatus and associated equipment
  • Mechanical and electrical engineering services
  • Machinery-inspection services
  • Electric motors
  • Electric motors, generators and transformers
  • Electrical services
  • Technical inspection and testing services
  • Installation services of electric motors
  • Electrical installation work
  • Electrical engineering installation works
  • Switchgear

Tags

  • award
  • contract

Published

2 years ago

Description

Motors, Drives and Variable Speed Drives are vital to United Utilities and are process critical in many Water and Wastewater treatment activities. This requirement is split in to two lots, Lot 1 Repair of Motors and Lot 2 Repair of Variable Speed Drives.
Lot 1 – Repair of Motors
The Scope of Work shall include for all services predominantly associated with repair, rewind and overhaul of Electric Motors.
Lot 2 Repair of Variable Speed Drives
The Scope of Work shall include for all services predominantly associated with repair, reassembly and testing of Variable Speed Drives.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

BC5457 - Tir-y-Berth Primary School - LED Lighting

You are invited to submit a tender for the installation of LED lighting and associated works at Tir Y Berth Primary School, New Road, Hengoed CF82 8AU. The scope of the project is fully described in Tender Documentation but in summary the scope is: - The Electrical Services Installer shall allow for the safe isolation, removal and disposal of existing lighting as per the associated drawings. This forms part of Caerphilly CBC LAEF/Invest to Save Scheme. - The Electrical Services Installer shall allow for the supply and installation of new LED Light fittings and lighting as per the tender drawings. - The Electrical Services Installer shall allow for the installation of new emergency light fittings. This must include all required wiring alterations, cabling, GMS containment, key switches and sundry items. - The Electrical Services Installer shall allow for the installation of new lighting controls including all wiring alterations, cabling, GMS Containment and sundry items. They should also include for the inspecting and testing all existing lighting controls, any faults found shall be reported to the Contract Administrator. - The Inspection and Testing of all lighting circuits with results being provided to the Contract Administrator on Electrical Installation Condition Report Certificate. All emergency lighting works shall have an Emergency Lighting Certificate. - The provision of record drawings and O&M manuals. - Programme to be agreed with Contract Administrator and School

Katy Reed

Published 1 day ago
Open

Removal and Installation of Dubh Artach Entrance Platform

NLB have a requirement for the removal and installation of the entrance platform at Dubh Artach lighthouse, situated off the west coast of Scotland, approximately 70 miles south-west of Oban, at a position of 56º 08.0’ North, 06º 37.9’ West. The structure stands 38 meters high and is constructed from granite blocks. The light is at an elevation of 44 metres, flashes 2 white every 30 seconds, and has a range of 20 miles. The lighthouse tower is the only building on the rock outcrop. The tower is accessed by a vertical ladder from the base of the tower to a steel platform 9.8m above. The ladder is fitted with a fall arrest system that must be used when climbing the ladder. The primary access to Dubh Artach Lighthouse is by helicopter, and landing at this light is only to be carried out on the ebb tide. Due to the limited time window for helicopter operations the successful contractor will be required to stay on site, living within the lighthouse tower. An NLB technician will be on site for the duration of the works to supervise and maintain a functioning light. We are estimating 4 people in total staying at the lighthouse during the accessible periods outlined below, 3 maximum from the successful contractor and 1 NLB technician. Our requirement is for the removal of the existing aluminium entrance platform at Dubh Artach, then installing the replacement entrance platform to completion, currently being manufactured by a third party to NLB drawings specifications. Due to the location of this site, the majority of materials and equipment will be transported to and from site via NLB vessel & helicopter. For more information about this opportunity, please visit the Delta eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-Edinburgh:-Works-for-complete-or-part-construction-and-civil-engineering-work./UE3TT9YQ93 To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/UE3TT9YQ93

Katy Reed

Published 3 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Cara Gaskell

[email protected]

+44 01925678021

Timeline complete

Publish
Bid
Evaluate
Award
Complete