DPS for the Provision of Highways and Civil Engineering Works

Award

Value

£1,852,980

Classifications

  • Works for complete or part construction and civil engineering work
  • Construction work
  • Site preparation work
  • Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
  • Construction, foundation and surface works for highways, roads
  • Construction work for highways, roads
  • Various surface works
  • Foundation work for highways, roads, streets and footpaths
  • Engineering works and construction works
  • Building demolition and wrecking work and earthmoving work
  • Landscaping work
  • Fencing, railing and safety equipment installation work
  • Erection of fencing
  • Footpath construction work
  • Surface work for footpaths
  • Foundation work for footpaths
  • Car park building construction work
  • Ground-drainage work
  • Drainage and surface works
  • Drainage works
  • Flood-prevention works
  • Carriageway resurfacing works
  • Resurfacing works

Tags

  • award
  • contract

Published

2 years ago

Description

Powys County Council has established a Dynamic Purchasing System (DPS) for the Provision of Highways and Civil Engineering Works across the County of Powys.
The DPS will run for an initial period of 3 years from 27th July 2018 with an option to extend for a further period of periods of up to a maximum of 36 months.
This award notice relates to any awards made following mini-competition tender processes for the period 1st July 2022 to 30th September 2022.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Flood Cell 06, Snape Maltings

The Upper Alde & Ore Estuary Embankment Improvements scheme will reduce tidal flood riskand enhance the environment in the Upper Alde and Ore Estuary. The Alde and Ore Estuary is vulnerable to flooding from the sea made worse by the poor condition of many of the flood defences. The proposed Flood Cell 06, Snape Maltings scheme is 1 of 4 cells identified to improve the Standard of Service of the existing flood defences and provide resilience to withstand 300mm of overtopping from a 1:200+ year event, given predicted sea levels in 2050. The Client is theEast Suffolk Water Management Board. In summary, the scope of Works for the project includes civil engineering works (but is not limited to):  Establish main site offices, compound, temporary services and access routes.  Alliance House - Installation of approximately 20m of new demountable defences along the quay side with piled and concrete slab foundation;  River Alde Quay - Installation of approximately 120m of new demountable defences along the northern quay side with piled and concrete slab foundation;  Henry Moore Lawn - Improvement to approximately 80metres of earth flood embankment to be constructed in a passive fashion to provide improved flood protection and amenity and access value around the Henry Moore Lawn area terminating at the northeastern edge of the Concert Hall building; and  Terrace Car Park - Improvement to approximately 100metres of earth flood embankment, incorporating pedestrian access provision, constructed from the River Cafe terrace area, terminating into the southeast car park area. The works are estimated to cost around £2.3million. The form of contract will be a NEC4 ECC Option A. All tender documents are available through the Client or the Client's appointed tender and contract manager Stantec UK Ltd.

Katy Reed

Published 1 hour ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

[email protected]

+44 01597826000

+44 1982552836

+44 1938500458

Timeline complete

Publish
Bid
Evaluate
Award
Complete