Forest Roads Construction Framework

Award

Value

£36,000,000

Classifications

  • Works for complete or part construction and civil engineering work
  • Construction work for highways, roads
  • Construction, foundation and surface works for highways, roads

Tags

  • award
  • contract

Published

2 years ago

Description

Natural Resources Wales is required to employ appropriate contractors to construct, maintain, repair, service or upgrade physical structures and / or associated land within the Welsh Government Woodland Estate that is managed by Natural Resources Wales.
Works under the Forest Roads Construction Framework may be inclusive of but not limited to the construction and maintenance of:
a. Forestry roads;
b. Forestry tracks and ramps (Stoned and unstoned)
c. Earthworks and associated features
d. Turnarounds, lay bys, passing bays etc,
e. Timber stacking bays and skyline bays
f.  Culverts and other drainage control structures such as SuDs;
g. Armoured crossing points
h. Bridges including temporary bridges;
i.  Paths and recreational facilities
j. Quarrying Activities
l. General Infrastructure

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Beach Management Framework

The Environment Agency requires a Framework to deliver its routine and ad-hoc beach maintenance works across all coastal frontages in England that it is responsible for. This maintenance typically consists of moving/transporting large volumes of shingle from areas of accretion to areas of erosion and evenly re-distributing shingle along the sea to restore/maintain the required standard of protection. There is a requirement to import marine dredged or land-based shingle onto coastal frontages to replenish lost material and to conduct maintenance/repairs to coastal defences and structures. There is a requirement to import and place rock on coastal frontages, as well as to provide coastal incident response, recovery and readiness support in the event of extreme weather events. This maintenance is essential to minimise the risk of coastal flooding to residential properties and commercial businesses. Market Engagement was undertaken using PIN notices via the PCR 15 regulations in May and December 2024. The Framework will operate as a single National Lot with a maximum of two Delivery Partners being appointed onto the Framework. The Framework duration will be a six-year (72 month) initial period with a 2-year (24 month) extension option (total eight years). The total estimated value of the Framework will be between £469,000,000 to £1,227,166,000 (exclusive of VAT). The procurement documents are available for unrestricted and full direct access, free of charge, at https://defra-family.force.com/s/Welcome Any questions, requests to participate, or tender submissions must be submitted electronically via this portal.

Katy Reed

Published 4 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete