CBC-1380-T-CE Highways Services Partner

Award

Value

£250,000,000

Classifications

  • Construction work for highways, roads
  • Highway maintenance work
  • Highways consultancy services
  • Highways engineering services
  • Hedge trimming
  • Installation of road signs
  • Drainage works
  • Street-lighting maintenance services
  • Snow-clearing services
  • Footpath construction work
  • Ground-drainage work
  • Traffic-calming works
  • Ice-clearing services
  • Drainage and surface works
  • Gully cleaning and emptying services
  • Installation of street furniture
  • Erection of road-barriers
  • Construction, foundation and surface works for highways, roads
  • Carriageway resurfacing works
  • Resurfacing works
  • Surface work for highways
  • Installation of road signals
  • Cycle path construction work
  • Verge maintenance work
  • Maintenance services of public-lighting installations and traffic lights
  • Paving and asphalting works

Tags

  • award
  • contract

Published

2 years ago

Description

Central Bedfordshire Council (CBC) is procuring a delivery partner to maintain, manage and improve its highways network and associated assets. The estimated value is £19,000,000  (nineteen million pounds) per annum to £25,000,000 (twenty-five million pounds) per annum. £190,000,000 to £250,000,000 over the 10-year duration (seven-year contract with a maximum of three one-year extensions).

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Sutton Local Plan Strategic Transport Assessment

The project is to prepare and finalise a Strategic Transport Assessment to support the preparation of the new Sutton Local Plan. The scope of work is expected to cover the following (the full tender specification should also be referred to): The purpose of this work is to demonstrate how the transport network is likely to operate in response to the changes in travel behaviour arising from development, including allocated sites, under the proposed Local Plan and supporting evidence base documents. The Strategic Transport Assessment will include transport modelling, and also incorporate separately published Transport for London / developer models and analysis to assess the effects of the development planned under the Local Plan on the local and strategic highways network in the borough, as well as public transport and active travel up to the end of the proposed plan period. It will recommend new projects and mitigation to address impacts of the Local Plan and other planned growth nearby. The Strategic Transport Assessment should assess impacts related to the highway network (strategic and non-strategic); public transport (bus, rail and tram), and active travel (walking and cycling). The Strategic Transport Assessment should be informed by the National Planning Policy Framework (NPPF) as well as the Department for Transport Transport Analysis Guidance (TAG) and Transport for London Transport Assessment guidance. As such, the Strategic Transport Assessment must: cover the whole plan area, including existing areas, growth areas and proposed site allocations; review the locations of proposed site allocations, growth areas/corridors or clusters of development, and potential options for the provision of sustainable transport and transport networks to serve them; identify transport issues as they affect all modes and freight, including accessibility, road traffic congestion, mobility, overcrowding, safety, air quality and noise pollution, affordability, carbon reduction; develop potential options or interventions to address the issues identified and any gaps in the networks in the short, medium and longer term; identify options for maximising active and sustainable travel; and identify options to improve the accessibility of transport nodes, such as rail and bus stations to facilitate integrated solutions. Please refer to the specification in the attachment section on the portal for full details.

Katy Reed

Published 9 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete