Gartnavel General Hospital - Beatson Obsolete Building Energy Management System (BEMS) Replacement - Phase 1

Award

Value

£656,134

Suppliers

Classifications

  • Energy-management services

Tags

  • award
  • contract

Published

2 years ago

Description

NHS GG&C require the Building Energy Management System (BEMS) at the Beatson Cancer Care Hospital to be upgraded to meet the criteria detailed with the BRE Energy Management and Building Controls briefing paper. This means that a full ’turnkey’ project encompassing a fully designed, supplied, installed and commissioning of the project is needing to be delivered. The project will upgrade the existing control installation including the design of revised control strategies, supply and installation of new controls panels along with all required sensors, hardware & software to allow the BEMS to be a managed protocol, remotely accessible system which meets the full criteria of “Class A” of the BRE paper is required. This will need to be completed by End March 2023 to meet financial deadlines imposed by the Scottish Government.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

UKRI-4850 STFC (Daresbury) Building Energy Management Systems (BEMS) - maintenance, reactive, remedial and project works

The contracting authority is UKRI and the services are for their STFC Daresbury Laboratory. The aim of this procurement is to contract with a Service Provider to complete all Planned, Preventative Maintenance (PPM), reactive and remedial works pertaining to BEMS for STFC Daresbury. We are looking to contract with a specialist BEMS maintenance Service Provider who has technical capability to deliver all aspects of the services. They should have the ability to be able to maintain a variety of brands of BEMS. The Service Provider is to be proficient in working in environments where detailed isolation prior to testing is planned and executed to ensure maximum safety, efficient testing, remediation of defects, and minimum disruption to the operation. Please review the entire documentation set and asset list held in the Delta eSourcing portal. All reactive and remedial works, and any costs associated with new assets are an estimate and they are not guaranteed. Whilst it is STFC’s intention to purchase the majority of its requirements under this Contract Arrangement from the Service Provider appointed, this does not confer any exclusivity on the appointed Service Provider. STFC reserve the right to purchase any requirements (including those similar to this and covered by this procurement) from any Service Provider outside of this Contract. For more information about this opportunity, please visit the Delta eSourcing portal at: https://ukri.delta-esourcing.com/tenders/UK-UK-Swindon:-Energy-and-related-services./9QVV32AKQJ To respond to this opportunity, please click here: https://ukri.delta-esourcing.com/respond/9QVV32AKQJ

Katy Reed

Published 1 week ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Oliver Bailey

[email protected]

+44 1412015369

+44 1355233732

Timeline complete

Publish
Bid
Evaluate
Award
Complete