Consultants Framework for Development Programme - Lot 2 - Architects (Small/Specialist Works)

Award

Description

Notting Hill Genesis (NHG) is procuring a framework of consultants to support a development programme for the delivery of new homes across London. This Contract Award Notice is in relation to Lot 2 - Architects (Small/Specialist Works) only. The other Lots relating to the framework of consultants were awarded on the Contract Award Notice Published on 8 July 2022 - Notice reference: 2022/S 000-018836.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

William Blake Windows and Redecorations – Design Team

City of London Corporation wish to procure a multi-disciplinary design team to undertake principal designer duties, deliver the pre-planning and full planning applications, produce specifications and cost plans ready to tender for the works and undertake contract administration duties for the Window Replacement and Associated Works project at William Blake Estate. The successful consultant is to survey the existing windows and external doors (where located within window sets) to determine how the existing windows are to be removed and replaced with new, efficient contemporary windows which will achieve Listed Building Consent. In conjunction with the window replacements particular consideration is essential to ensure that adequate ventilation is incorporated within the design proposals. Each block has its own set of windows in various fenestrations which consist mainly of timber framed single glazed sliding sash windows. The consultant will be expected to review previously approved planning applications and undertake any additional surveys for each block and window type before submitting new pre-planning applications (including summary of options) and then subsequently using the advice to submit full planning application. During the planning process, the consultant is expected to review previous planning submissions and responses and build the new specifications ready to tender either via a compliant open tender process or via a nominated framework. Subject to full planning permissions, the consultant will submit a specification to accompany City of London tender documents. The requirements for the new windows are to protect the building from external conditions, provide privacy and security, improve the acoustic performance, provide thermal insulation, aid in the external fabric’s resistance to spread of fire, provide access to daylight, provide controllable ventilation, resist wind loadings, and provide protection from falling and impact. The Corporation also intends to incorporate various associated works into this window replacement package, in order to maximise efficiencies and ensure that its landlord responsibilities are fully met. Although the window replacement element will undoubtedly be a key component of the works, a holistic approach is considered most appropriate at this stage, in respect of the blocks’ external envelope.

Katy Reed

Published 6 hours ago
Open

Torpoint Lower Fore Street RIBA 3 Detailed Design Reports

This package of work represents the development of the detailed design for the community hub and associated accommodation as well as the detailed design for the Public Town Square for the town of Torpoint, in South East Cornwall. A separate RIBA 3 report will be required for both elements. Both elements will run concurrently and the timeline to achieve them is critical to the success of the project. Grant Funding is paying for the delivery of both reports. The Project will constitute a combined community and housing development overlooking the River Tamar, adjacent to the Ferry Lanes and at the base of the main shopping street in the Town alongside the creation of a public open space in the form of a town square adjacent to the community hub. The focus must be on the ability to deliver a development with the community building at its centre with a clear understanding of potential cost. Both of these reports will support Torpoint and help them manage their way through local government funding and the detailed design must reflect this. The combination of the two reports will describe the centre of the Torpoint community for the future. Whilst the overall site is a significant development this quotation seeks to complete the detailed design (RIBA 3) study for the new community building and accommodation at the lower end of Fore Street on the site detailed in Enclosure 4. The requirement also includes a separate detailed design (RIBA 3) study for the Public Open Space detailed in the Masterplan at Enclosure 3. The aim is to define the assets to be delivered, understand the risks, issues, opportunities and costs for both sites and be in a position to submit an outline planning application for both, enabling the requirements of the One Public Estate (OPE) funding and the needs of the town and its community. The aim is to define the assets to be delivered, understand the risks, issues, opportunities and costs for both sites and be in a position to submit an outline planning application for both, enabling the requirements of the One Public Estate (OPE) funding and the needs of the town and its community. Both reports should clearly articulate how the spaces interact with each other to provide the community centre and the facilities to support them to enable entertainment and community use. The tenderer should also submit an outline planning application for both studies. The tenderer is to supply: i) A RIBA 3 Detailed Design for the community hub and the associated accommodation shown in the RIBA 2 Feasibility study . AND ii) A RIBA 3 Detailed Design for the Public Square. Both reports should clearly articulate how the spaces interact with each other to provide the community centre and the facilities to support them to enable entertainment and community use. The tenderer should also submit an outline planning application for both studies. The studies should include: a. Design studies and testing; b. Costing exercise to include professional fees and associated fixtures furnishings and equipment alongside potential Information Communication Technology (ICT) to reflect the evolved design and ensure budget viability; c. Reports on collaboration Architects and engineers are to demonstrate all aspects of design are integrated and practical with specific reference to the surrounding public realm and the coordination of activity between the two RIBA 3 studies; d. All recommendations from consultants are to be included including risks, issues, opportunities and dependencies; e. Outline planning application preparation and submission for both studies including all relevant documentation, drawings required for submission; f. Evidence that the designs meet building regulations and any other relevant requirements; g. A costed and refined final proposal; h. Any specific specifications, innovative design, or construction ideas; i. Advice on any specific consultants or specialists that may be required for the future as well as any specific surveys or actions that may be required to develop the plan to full planning approval; j. Potential delivery routes and programme for delivery (under an No Cost Extension contract); k. Construction strategy and timetable; l. Feedback and timetable of public consultations and statutory consultee discussions and actions. 3.3 The tender should contain Cost Breakdown for delivery by task and member of staff. 3.4 The tender should provide materials suitable to be displayed to the public as part of any consultation Torpoint Town Council might wish to undertake. Allowance should be made for a public consultation event in the town both inside and outside of the working day. Milestone Dates: - 1. Date Invitation to Tender (ITT) available on Contracts Finder 21st March 2025 2. Last date for raising queries - 1200 2nd April 2025 3. Last date for responses to clarifications to queries - 1700 3rd April 2025 4. Deadline to return ITT - 1200 6th May 2025 5. Evaluation of ITT - 7th May 2025 6. Evaluations reviewed by Town Team Project Board and recommendation made to Torpoint Town Council 12th May 2025 7. Award of Contract - 16th May 2025 8. Start Meeting - 30th May 2025 9. Two draft Reports ready for review - 6th October 2025 10. Torpoint Town Project Board presentation and review - 13th October 2025 11. Final two Reports Submission (Hard Deadline) - 13th November 2025 12. Full Torpoint Town Council Review of Reports 21st November 2025 The tender report submission should be completed in a PDF format and must be accompanied by: Covering letter (two sides of A4 maximum) to include: a. A single point of contact for all contact between the tenderer and Torpoint Town Council during the tender selection process, and for further correspondence. b. Confirmation that the tenderer has the resources available to meet the requirements outlined in this brief and its timelines this is a hard deadline. c. Confirmation that the tenderer holds current valid insurance policies as set out below and, if successful, supporting documentation will be provided as evidence: i. Professional Indemnity Insurance with a limit of indemnity of not less than one million (£1,000,000), ii. Employers Liability Insurance with a limit of indemnity of not less than two million (£2,000,000) iii. Public Liability Insurance with a limit of indemnity of not less than two million (£2,000,000). d. Conflict of interest statement. e. Torpoint Town Council has adopted a Climate Emergency Action Plan and requires as part of this procurement, information on how your organisation demonstrates its support for 'green initiatives'. Examples of two other similar projects for the mixed use element plus two projects of a public realm public square project that have been completed that demonstrate the ability and experience of the team being proposed (one side of A4 maximum per example). Please focus on the mixed use nature of the scheme and the cost / route for delivery. CV's of all relevant members of the team (one side of A4 maximum per CV). Programme of work. Clear articulation of any exemptions. Breakdown of expected costs and budget. The total maximum budget available for this commission is £190,000.00 (exc VAT), but inclusive of all expenses.

Katy Reed

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete