IF106 - Major Project Partnering Framework

Award

Value

£1,200,000,000

Classifications

  • Construction work for water projects
  • Design consultancy services
  • Works for complete or part construction and civil engineering work
  • Engineering works and construction works
  • Sewer construction work
  • Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry
  • Pipelaying construction work
  • Sewage work
  • Works related to water-distribution pipelines
  • Water-main refurbishment construction work
  • Water-treatment plant construction work
  • Sewage plant equipment
  • General construction work for pipelines
  • Ground-drainage work
  • Electrical installation work
  • Electrical installation work of heating and other electrical building-equipment
  • Pumps
  • Civil engineering consultancy services

Tags

  • award
  • contract

Published

1 year ago

Description

NIW wishes to set up a partnering framework to support delivery of all elements of its proposed Living With Water Programme, large projects (greater than £10m) in NI Water’s PC21 and PC27 capital works programme and any joint agency projects as may arise. The intention is to award contracts under this framework in 3 Lots: Lot 1: Civil Engineering Design Consultants; Lot 2: Civil Engineering Contractors; and Lot 3: Process Engineering including MEICA Design and Construction Contractors; Estimated value for the 3 lots for the initial 4 year period and potential 4-year extension period is in the range of £30,000,000 - £120,000,000 (Lot 1); £600,000,000 - £900,000,000 (Lot 2) and £200,000,000 - £400,000,000 (Lot 3). Further information is available within the suite of PQQ tender documents

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Penwith Gallery Studios 1-3, Reactivating the Creative Spaces

The Penwith Gallery is the home of the Penwith Society of Arts in Cornwall. The Gallery, formerly an old pilchard packing factory, has a remarkable complex of buildings, including three public galleries, artists' studios, a print workshop, a sculpture courtyard, shop and archive.The Society was founded in 1949 by Barbara Hepworth, Ben Nicholson, Peter Lanyon, Bernard Leach, Sven Berlin and Wilhelmina Barns-Graham, amongst others. This association with so many progressive and influential artists has given the Penwith Society a unique place in British art history. A charitable company - Penwith Galleries Ltd - was created to arrange the programme of exhibitions, execute all gallery business and manage the entire complex. Today the Penwith offers a year-round programme of exhibitions by Society Members and Associates, as well as those by other artists from Cornwall and further afield. The Penwith continues to be at the forefront of presenting contemporary work of quality. Our project will involve the reconfiguration and reactivation of space currently occupied by three of our eleven artists' studios above the main gallery. The studios are situated in what was formerly St Peter's Loft, Peter Lanyon's school of painting. Studios 1 and 2 are no longer fit for purpose and have been redundant for some time. They need reboarding with additional fireproof materials, and studio 1 is in need of proper fire exit access. The two studios share a site with Studio 3 which is the long-term home of the Porthmeor Printmakers Workshop. This space is still in use as a working and teaching space at present but requires significant works in order to continue to be a viable site in the future. Boards need replacing here too and proper toilet facilities need to be installed to replace the inadequate current amenities, and the layout itself is poorly arranged with a lot of dead space which could be repurposed to better effect. We intend to reconfigure the layout across all three current studios, moving Studio 1 to the other end of the Print Workshop, building a fire corridor, moving and improving the Printmakers Workshop office space and creating a fourth studio for a new artist tenant. We propose beginning the works in December 2024 during the gallery closure and completing the works by March 2025

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Capital Procurement Team

[email protected]

[email protected]

+28 90324452

[email protected]

+28 90551200

Timeline complete

Publish
Bid
Evaluate
Award
Complete